PAPERmaking! FROM THE PUBLISHERS OF PAPER TECHNOLOGY Volume 4, Number 1, 2018
COMPANY, SITE
SUPPLIER
DESCRIPTION
START-UP
Klingele Group Werne site Germany
TBA
To extend the logistics centre which will provide space for approx. 20,000 pallets in the future. To modernise PM1, including supplying a new shoe press and calender. To modernise IT systems based on Tieto Paper Solution on SAP and Tieto Integrated Paper Solution (TIPS) for the global paper industry. To supply 115tpd tissue plant (PM2).
End 2018
Kyiv Cardboard and Paper Mill JSC Lecta Group (seven mills in Spain, France and Italy) Lilas SAH (Société d’Articles Hygiéniques) Zriba facility (near Tunis) Tunisia
Andritz
End 2018 / Start 2019
Tieto
NA
Recard
End 2018
Lucart Group Porcari plant Province of Lucca Italy
Toscotec
To replace two old MG PMs with a new line (PM12) capacity 35,000tpy tissue.
H2 2018
Manipulados Emreser S.L. Murcia Spain Mariysky Pulp and Paper Mill Volzhsk Russia Merkas Tekstil Sanayi VE Ticaret AS Turkey
Pasaban
To supply a paper and board winder.
NA
Andritz
To upgrade the existing stock preparation line of PM1 with state-of- the-art equipment for thickening and high-consistency refining.
Q3 2018
A.Celli Nonwovens
To supply of a new generation STREAM® winder.
H2 2018
Metsä Board Husum Pulp Mill Sweden
SPM Instrument AB
To introduce online condition monitoring of production-critical equipment in its fibre line, specifically the Intellinova Parallel EN online system.
NA
Metsä Board Kaskinen Pulp Mill Finland
Valmet
To supply a baling line.
End 2018
Metsä Tissue Mänttä Mill Finland Metsä Tissue Žilina Mill Slovakia
Andritz
To modernise and upgrade the existing DIP line.
NA
TBA
To install a new converting line.
End 2018
Mitsui Engineering & Shipbuilding Co., Ltd. Ichihara Chiba Prefecture Japan
Andritz
To supply a highly efficient, biomass- fired circulating fluidized bed boiler.
Q3 2020
Monalisa Co. Ltd. Jeonju South Korea
Andritz
To supply the key components for a new sludge dewatering process to be installed at its tissue production line.
NA
Installations
Page 4 of 8
Made with FlippingBook Ebook Creator