The levels of attendance and manual testing will depend on the boiler equipment layout. They should be considered in conjunction with the findings of the risk assessment and information on the type and level of manning that is intended to be employed. It is more important that the target levels of monitoring and supervision are met rather than having a boiler that matches the example in the diagram.
Typical equipment for the boiler:
BG01 Guidance on the safe Operation of Steam Boilers Edition 2 – © 2019
Page 46
Made with FlippingBook - Online catalogs