PAPERmaking! Vol5 Nr2 2019

Typical additional equipment in the boiler house - 72 hours unattended is only possible with the following additional controls:

Where this additional equipment is not provided this decision must be supported by a risk assessment and other control measures may be required.

BG01 Guidance on the safe Operation of Steam Boilers Edition 2 – © 2019

Page 49

Made with FlippingBook - Online catalogs