WEEK 1 (2, 3, 4 ….)
Date
Time
Print Name
Circle as required
Result of evaporation test
Boiler One
Boiler Two
Boiler Three
Gauge glasses blown down
No
No
No
Yes
Yes
Yes
Failed
Failed
Failed
1 st low audible alarm
Sounded
Sounded
Sounded
Failed
Failed
Failed
1 st low visual alarm
Observed
Observed
Observed
Burner shutdown at 1 st low
Failed
Failed
Failed
Yes
Yes
Yes
Failed
Failed
Failed
2 nd low audible alarm Sounded
Sounded
Sounded
Failed
Failed
Failed
2 nd low visual alarm
Observed
Observed
Observed
Boiler lock out at 2 nd low Remote alarm (audible) Security Lodge Remote alarm (visual) Security Lodge Is water visible in gauge glasses at lockout? Pump on after 1 st low recovered
Failed
Failed
Failed
Yes
Yes
Yes
Failed
Failed
Failed
Sounded
Sounded
Sounded
Failed
Failed
Failed
Observed
Observed
Observed
Failed
Failed
Failed
Yes
Yes
Yes
Failed
Failed
Failed
Yes
Yes
Yes
Failed
Failed
Failed
Burner restart check
Normal
Normal
Normal
Flame Inspection at Low Fire Hold
Normal
Abnormal
Normal
Abnormal
Normal
Abnormal
Pump stop and start
Normal
Abnormal
Normal
Abnormal
Normal
Abnormal
Flame failure device test Manual blow down performed
Failed
Failed
Failed
Passed
Passed
Passed
Not performed Not confirmed
Not performed Not confirmed
Not performed
Performed
Performed
Performed
Blow down OK Not confirmed IN THE EVENT OF ANY FAILURE OF EITHER THE EVAPORATION TEST OR THE FLAME FAILURE DEVICE, THE BOILER IS TO BE SHUT DOWN AND ISOLATED. THE FAILURE MUST BE REPORTED AND RECORDED IMMEDIATELY. Confirmed Confirmed Confirmed
BG01 Guidance on the safe Operation of Steam Boilers Edition 2 – © 2019
Page 55
Made with FlippingBook - Online catalogs