Sterling Heights Assembly Plant‑SHAP 2018 DT Program Sterling Heights, MI

Total area: 425,000 sq. ft.

The 2019 DT Program at FCA’s Sterling Heights Assembly Plant (SHAP), part of the wider retooling effort to launch the 5th‑generation Ram 1500 (“DT”). Primarily involved installing new equipment in the south paint shop.

Scope of Work

Electrical engineering design project for a paint shop or production line add on during the DT program. Design, en - gineering, and documentation of electrical systems supporting new or upgraded paint shop equipment at Sterling Heights Assembly Plant (SHAP) as part of the 2018 DT Program vehicle launch. Work includes power, control, and interlock systems for cleaning, coating, and environmental conditioning zones.