2022 Brochure

CLIENT TESTIMONIAL

Rapid-EPS are proud to have worked with great clients around the world CLIENTS

Demolition work was being carried out by a 72 tonne hi-reach machine to adjacent slabs & steel work.

During the inspection I have not noticed any defect, deflection or dislocations from their initial installation. The product is very easy to check that everything is installed correctly with a clear visual indicator at the top of the post. Having the wide post centres means that installation is quick and easy which was critical for this job. I had 3 members of staff erecting the equipment with ease. The Rapid system was great and I would recommend using this on future sites. Lukasz Salamon Site Manager - Kier Construction

www.rapideps.com

30

31

Made with FlippingBook - professional solution for displaying marketing and sales documents online