GARN® GN2000 WHS | Operator Manual

INSTALLATION : UNIT PLACEMENT

CLEARANCE TO CEILING

• Vertical space requirements for access to the manway cover on top of the unit, to allow for periodic visual inspection of the inside of the GARN® unit. This also facilitates entry into the GARN® unit if required for cleaning.

When locating the GARN® WHS unit, consider the following carefully:

• Traffic patterns past the unit: service doors, any overhead doors, pump locations, etc. • Source of electrical power and location of electrical panel. • The routing and insulation of piping to the heating system. • Location of wood fuel storage. • Unit position considering where heat is to be delivered (i.e. distance to other buildings, etc). • Sufficient space for heating system pumps and controls. • Position and type of flue (horizontal or vertical) with reference to other nearby buildings. NOTE: • If installing a combustion air damper, increase the rear clearance from 8” to 24” minimum to allow sufficient room for damper installation and maintenance.

18

GARN® WHS 1000 and WHS 2000 Manual | © HY-C® Company LLC | October 2024

Made with FlippingBook - professional solution for displaying marketing and sales documents online