Recommendations
The Facilities section recommends a facility fit study to determine options for expanding the Community Centre. Any expansion to the Community Centre would likely impact the two existing fair buildings closest to the arena (office and canteen), and potentially the Crystal Palace (the Pigeon Barn will be removed). Once a determination is made on an expansion (if any), the site should be designed with park operations base in mind (with adequate and appropriate storage space and access), and space for the continued operation of the annual Fair. The Outdoor Multi-Purpose Rink was donated by the McLean Family. Originally it was meant to be a community-run facility, but the Town has assumed complete responsibility of operations and maintenance. The rink is very well used in the winter, however there have been consistent concerns about vandalism and arguments between users. The schedule is set for alternate days of hockey or family skating, but the schedule is often not respected, leading to calls to police and conflicts. For the 2023/24 season, staff time is being dedicated to monitoring the rink, a practice that should likely continue in future years. The Town should install lights and cameras to discourage vandalism of the facility. The basketball court, accessible playground and splash pad require no changes, and should continue to be provided and maintained throughout the term of this Plan. The addition of a washroom and concessions building near the diamonds is discussed under the Facilities Section.
PCT 12. Provide wayfinding signage through the Community Centre hub directing people to the various facilities, amenities, and connections. PCT 13. Update the water features at Lake Lisgar Water Park. PCT 14. Review agreements for Fair buildings. PCT 15. Remove the condemned Pigeon Barn from Town facility supply. PCT 16. Install lights and cameras at the McLean rink to discourage vandalism.
92
Town of Tillsonburg | DRAFT Parks and Recreation Master Plan
Made with FlippingBook - PDF hosting