Table B-2: Inventory of Town trails # Trail Name
Length
Amenities
Notes
• gravel and paved pathways • donated land and money from Pat Carrol l and Family • shared land with golf course • shares space with Trans Canada Trail (TCT) • unmaintained Nov-May
•
trail head signage
•
river lookout
Carroll Trail (21 Van St)
786.7m (4.39km)
•
benches
1
•
shared bridge with golf course
•
gravel pathway
•
maintained by Parks staff
Trottier Woods Trail (3 Trottier Dr.)
162.2m (0.13km)
2
•
room for expansion
•
unmaintained Nov-May
•
access to playground access to basketball nets
•
paved pathway,
South Ridge Trail (20 South Ridge Rd)
221.1m (0.22km)
•
unmaintained Nov-May
3
•
benches
•
heavily used by South Ridge Public School
•
garbage cans
•
new from 2022
•
Benches
•
trail is concrete
•
bike racks
Northcrest 2 Trail (44 Martin St)
357.3m (0.47km)
•
trail will connect to future trails in the area
4
•
garbage cans, access to playground
•
can gain access to TCT
• •
unmaintained Nov-May
gravel path way
Northcrest 2 Trail – North St Connector (No civic address – beside 56 North St E)
246.3m (0.34km)
•
skirts drainage ditch
5
•
unmaintained Nov-May
166
Appendix B
Made with FlippingBook - PDF hosting