#
Trail Name
Length
Amenities
Notes
• paved pathway (2021) • switch back leads to TCT • volunteers have planted many native tree/shrubs in area • trail connection to Livingston Dr • water management pond located on south end of trail • unmaintained Nov-May • gravel pathway • part of the Trans Canada Trail • maintained by Parks staff • bollards to stop motorized vehicles • gates at both entrances • private fence for two neighbours located on N end of trail • unmaintained Nov-May • gravel pathway • erosion issues from Lisgar Creek • new AODA ramp being installed by Oxford County to connect with TCT (2023) • new bridge being installed over the path by Oxford County (2023) • unmaintained Nov-May • gravel path • access from Lisgar Ave • major route for apartment residence • home of “Turtle Garden” • reclaimed in 2023 • unmaintained Nov-May
Trans Canada Trail – North St. Collector (No civic address – beside 53 North St E)
249.3m (0.31km)
6
TCT - North St Trail - Cranberry Rd to North St. (No civic address
525 m (1.67km)
7
– beside 132 North St. E)
North St - Trans Canada Trail Collector (No civic address)
198.2m (0.23km)
8
• trail head signage
• turtle garden benches • lit pathway • lake views
McLaughlin Way (48 Sanders St)
497.3m (0.73km)
9
• Access to tennis/ pickles court, horseshoe pits,
Rotary Park Trail (No civic address – across from 45 Hardy)
• installed in 2021 • unmaintained Nov-May
226.1m (0.35km)
10
Optimist baseball fields, playground
167
Appendix B
Made with FlippingBook - PDF hosting