2024-06-10 Town of Tillsonburg Parks and Recreation Master …

#

Trail Name

Length

Amenities

Notes

• paved pathway (2021) • switch back leads to TCT • volunteers have planted many native tree/shrubs in area • trail connection to Livingston Dr • water management pond located on south end of trail • unmaintained Nov-May • gravel pathway • part of the Trans Canada Trail • maintained by Parks staff • bollards to stop motorized vehicles • gates at both entrances • private fence for two neighbours located on N end of trail • unmaintained Nov-May • gravel pathway • erosion issues from Lisgar Creek • new AODA ramp being installed by Oxford County to connect with TCT (2023) • new bridge being installed over the path by Oxford County (2023) • unmaintained Nov-May • gravel path • access from Lisgar Ave • major route for apartment residence • home of “Turtle Garden” • reclaimed in 2023 • unmaintained Nov-May

Trans Canada Trail – North St. Collector (No civic address – beside 53 North St E)

249.3m (0.31km)

6

TCT - North St Trail - Cranberry Rd to North St. (No civic address

525 m (1.67km)

7

– beside 132 North St. E)

North St - Trans Canada Trail Collector (No civic address)

198.2m (0.23km)

8

• trail head signage

• turtle garden benches • lit pathway • lake views

McLaughlin Way (48 Sanders St)

497.3m (0.73km)

9

• Access to tennis/ pickles court, horseshoe pits,

Rotary Park Trail (No civic address – across from 45 Hardy)

• installed in 2021 • unmaintained Nov-May

226.1m (0.35km)

10

Optimist baseball fields, playground

167

Appendix B

Made with FlippingBook - PDF hosting