JEB Partitions Sustainability Certifications Profile

Best Management Practice

Take-Back Program*

• Avoid: Design precision and pre-cut fabrication minimise waste at source

• Trigger: Any partition removal or end-of-life event activates the take-back protocol

• Minimise: Modular components reduce off- cuts during installation

• Dismantling & Segregation: Site Supervisor oversees removal; mixed-waste disposal of recoverable materials is prohibited under SOP

• Reuse: Demounted systems can be reconfigured or redeployed at site

• Collection: Approved recycler collects

materials and issues weight-based delivery documentation within 14 days

Segregation: Aluminium, metal hardware, glass, and packaging kept separate from general waste

• Documentation: Project Manager uploads weight bills to SharePoint within 7 days; JEB Product Take-Back Tracker updated with kg recovered, recycler name, and proof of receipt date

• Recycle: Segregated recyclables directed to dedicated material streams

• Dispose: Landfill and/or Incineration will be the last resort

Material Pathways

• Aluminium and metal hardware: Collection by approved commercial recyclers, most metals can be recycled indefinitely without losing its properties.

• Glass: Product take-back via manufacturer supply chain, processed into cullet and recycled into new glass products.

*The take-back programme is fully operational for direct office projects managed by JEB. For projects fulfilled through dealer or distribution channels, take-back capability is encouraged, subject to local recycler availability and regional infrastructure.