G rounds Dept has many projects going on from hard wood trimming to palm tree trimming ,the entire property common areas and all condominium properties being trimmed. Fertilization of turf areas and plantings has been completed. A number of large sprinkler is- sues have been worked on. Some hand watering of palms thru out the property is being done. The lack of rain has caused plants and turf areas to show signs of distress with a lot of leaf drop. When the rains come back so to will most of the vegetation . GROUNDS UPDATE
OPERATIONS UPDATE
S ummer is here! Many of you are returning or have returned to your other homes. Please make sure your homes are secure and your con- tact information is up to date in our system. Also, it is beneficial for homeowners to: • Videotape or photograph the interior and exterior of the building; this will assist you in verifying insurance and tax credit claims as it relates to your units. • Back up your computer files. If needed consult an agency that can help and should also be available to help you restore the information after the storm. • Assemble insurance policies, financial records, inventories, and other important documents. Make duplicates and store them in alter- nate safe places.
Bruce Zergott Ground Manager
Jorge Abreu Director of Operations
not be limited to sidewalk repairs will be underway, roofing project in the garden villas will be underway, the roof at Condo 5 will have been completed and re- construction of the interiors underway, Condo 4 roof will be underway, as well as work on Condo 24 and engineering on Condos 3 and 25. Please refer to the hurricane update for ongoing proj- ects in Seven Lakes as we are focusing our attention is in those areas. Marcy and I wish you safe travels, an enjoyable sum- mer and a safe return in the fall!!
• Bring in any other loose objects that are normally left outside. • Clear all desk and table tops of small loose items. • Disconnect all electrical appliances and equipment. • Box or place any loose papers, books, hanging plants etc., in desk drawers or storage cabinets. While you are away, we will be working on various projects throughout the community. The maintenance will be working on preparations for the upcoming rainy season: • Clean drains, gutters and downspouts of the building. • Check equipment and generators for secureness or possible relocation • Inspections of association areas for loose items and storage if unused assests • Securing attic access panels and roof hatches • Checking AC strapping on building rooftops Other projects during these months will include but
T he facilities team will be working on storm related issues in the month of June. The roofers are currently working on building 4, and 5 trying to install the TPO. They should complete the job by the end of June weather permitting. The maintenance department is trying to bring back the curb appeal at Seven Lakes in every way possible. We have contractors scheduled to start repairing all damage side- walks, condo units, and cart barns. We will keep you posted as we proceed. MAINTENANCE UPDATE
As always thank you for the opportunity to serve.
Tony Dockett Maintenance Manager