2025 ROAD PROJECTS MAP
2025 ROAD PROJECTS
2025 ROAD CONSTRUCTION PROJECTS
2025 City Pavement Rehabilitation Project Pavement maintenance, including full-depth reclamation and reconstruction of streets and utility maintenance in the Frontier Trail and Conestoga areas. Work will extend service life, improve driving conditions and reduce maintenance costs. 6 roundabouts, multi-use trails and stormwater improvements to enhance road safety, provide pedestrian and cyclist pathways and facilitate the road’s jurisdictional transfer from Carver County to the city. 5 Galpin Boulevard Improvement Project Upgrading Galpin Boulevard to an urban section with Crimson Bay Road Project Reconstruction of Crimson Bay Road with pavement replacement, new sewer and watermain, and drainage improvements. As part of Highway 5 safety upgrades, access to Highway 5 will be removed, with access provided from 78th Street. 3 reduce congestion and improve safety for students, families and commuters. Construction will require a full highway closure and detour during the summer when school is out of session. 4 82 nd Street County Highway 18 Project Reconstruction of 82nd Street to convert it from gravel to a paved road while improving stormwater drainage and pedestrian accessibility. Part of a broader effort to complete a key County Highway segment. 1 State Highway 5 Improvements Expanding Highway 5 from two to four lanes, reconstructing existing pavement, upgrading intersections and improving pedestrian access. Designed to improve capacity and safety. A full closure is planned in 2027 to accelerate construction. 2 State Highway 41 Roundabout A new roundabout at Minnetonka Middle School West to Pioneer Trail Improvements east of the Chanhassen boundary Resurfacing, shoulder widening, curb ramp updates and bridge replacement on Pioneer Trail from Trails End Road to Riley Lake Road to extend pavement life and improve accessibility. 7 Pavement and joint repairs, plus shoulder improvements near the Highway 212 and Highway 5 interchange to enhance traffic flow and safety. Temporary lane closures and delays are expected during the summer. 8 US Highway 212 and State Highway 5 Improvements
MINNESOTA
4
5
41
3
6
6
2
8
MINNESOTA
MINNESOTA
1
41
7
Want to learn more? Scan the QR code to view an online version of this article that includes more details and contact info for each project.
In addition to these specific road projects, Chanhassen residents may also notice work being done throughout the city in 2025 by private companies installing fiber-optic networks in public right-of-ways and utility easement areas, (such as street and sidewalk areas). You can check out the status of this work in your neighborhood by visiting our map at Chanhassen.info/fiberoptic. This map will be updated on an ongoing basis to reflect current installations.
6
7
SUMMER 2025 | CITY OF CHANHASSEN
CITY OF CHANHASSEN | SUMMER 2025
Made with FlippingBook Digital Publishing Software