TITAN TIMES | 2021 YEAR IN REVIEW
10 __
Getting in Deep with Concrete Protective Liner
Titan completed a pipe welding project using 3mm Concrete Protective Liner. We supplied the product and used it to weld together pipe sections that are part a of sewage pumping station overflow tank. The tank is used for additional sewage storage in the event that the pumps fail. It is designed to contain sewage overflow for up to 48 hours until the tanks are repaired.
Titan is the Name, Lining Ponds is Our Game!
In the fall Titan partnered with Halfway River Group of Halfway River First Nation in Fort St. John, British Columbia, and supplied and installed a 6-layer containment water storage pond system. The existing freshwater dam needed to be converted into two produced water storage ponds. The ponds consisted of 3 layers of 60mil HDPE (1 layer of single-sided texture and 2 layers of smooth), 2 layers of Geonet, and one layer of Geocomposite making up 196,000m2 of geosynthetics installed for this project.