The Basics Of Guardian Operation: Step 1. Install Vektek pressure switches on fixture. Step 2. Find a place and mount your Fixture Transmitter. Step 3. Find a location for your Machine Tool Receiver. Step 4. Wire your Master Control Unit with just four wires. Step 5. No more tool crashes! IT IS THAT SIMPLE.
What does Guardian read and confirm? The Vektek Guardian pressure monitoring system is designed to confirm that pressure is above a pre-set minimum. This can be done before indexing or while inside the machine. Typical checking is done at the load station before loading a fixture into the machine. Inside the machine sampling requires the fixture to be in a known location and between machine operations without coolant and spindle interference.
What if I want to check a pallet before it goes into the machine?
The simplicity of the Guardian allows for additional remote Machine Tool Receivers to engage with the Fixture Transmitter at any point it is in range. You can confirm pressure as a pallet is removed from storage, while it is on the way to the machine or even just before indexing.
Made with FlippingBook - Online Brochure Maker