Page 79 of 91
Newcastle Steel
KZN
Heunis
Gauteng
SS Profile Hendock
NW
KZN KZN
Roofco
Corr-Line
Gauteng
Algoa Steel Youngmans
EC
WC
Tudor Roofsheeting Gold Step Trading
Gauteng
FS
BSI
Gauteng/KZN
KK Roofsheeting
Gauteng Gauteng
Clotan
Trident Roofing
WC
Apart from 2010 Soccer infrastructure, demand coming from projects like Gautrain, TCTA water pipeline, Medupi (4,788MW) and Kusile power plants (4,800MW)
Demand driven by construction of Majuba (4,110MW), Kendal (4,116MW), Matimba (3,990MW), Tutuka (3,654MW) power stations and Rietvlei Dam extension
Driven by construction of Arnot (2,352MW), Kriel (3,000MW), Hendrina (2,000MW) power stations, and Sterkfontein Dam ofArnot
Demand stimulated by projects like Duvha (3,600MW), Koeberg (1,860MW), Matla (3,600MW) power stations, and Bloukrans Bridge
Primary steel product imports
2019
Tariff heading
Product
Imported Tonnes
Imported value
Estimated Value of total primary steel sales
Carbon steel products
7206-7207 Ingots, billets, blooms & other
5 134
R38 931 154
65
The South African Steel and Metal Fabrication Master Plan 1.0
Made with FlippingBook. PDF to flipbook with ease