Amtech ATV Cartridge Collector User Manual

9.4 When installing the compressed air supply to the air manifold(s), refer to the diagrams below.

10.0 ELECTRICAL/ CONTROLS

NOTE: All of the electrical installation must be performed by a qualified electrician and in accordance with local, state, and national codes/regulations/laws (if any).

10.1 The blower motor is typically configured to operate with 208-230/460 volt, 60 cycle, and 3 phase electrical power unless specified otherwise with the equipment order. Electrical power is connected to the J-box on the blower section of the collector. Below the J-Box is a decal that confirms the voltage the motor was set up for at the

Page 10

sales@clean-air.com

1-866-665-1829

www.clean-air.com

Made with FlippingBook Online newsletter maker