Multi-Use Pathway Phase 1 and Wetlands Trail Boardwalk McKim & Creed Project Location: Gulf Breeze, Florida Project Start Date: 6 July 2019 Project Completion: 1 December 2022 Project Team: Patrick Jehle, PE Glenn Halstead, PE Jonathan Green, PE A. Emmett Anderson III, PE Joel Moulin, PLA Taylor Henninge, PSM Jarod Burch Timothy Grigsby Chase Hambright Joshua Osborne Gerald Potter Chris Striba Zachery Taylor Alexis Ward Project Summary: To create a sustainable future and achieve the goals outlined in its Master Plan and Most Livable City Plan, the City of Gulf Breeze needed creative, cost-effective solutions to implement multi-modal improvements within the existing right-of-way of the City’s primary collec- tor ‘loop’ roadway. The project included surveying, engineering, and land- scape architecture services to design a new 10-foot-wide multi-use pathway along the Fairpoint Drive/Shoreline Drive loop, approximately four miles in length, that supports multi-modal transportation for bikes, carts, scooters, and other wheeled modes of transport in this active area of Gulf Breeze. A separate pile-supported wood boardwalk was designed to traverse across low lying wetlands in nearby Shoreline Park, providing interconnectivity between residential neighborhoods and the public park as well as a new public beach access along Santa Rosa Sound. Impact: The project outcomes that benefit the community includes enhanced capacity for collection and infiltration of stormwater runoff within the City’s right-of-way, the inclusion of twenty xeriscape gardens along the Multi-Use Pathway to highlight and enhance the entrances to various neighborhoods along the route, and highlighting the diversity of abundant flora and fauna within the Shoreline Park South ecosystem.
2
3
csengineermag.com YEA 2023
YEA 2022 csengineermag.com
Made with FlippingBook Annual report