Critical Solutions: The GAP Edge in Nuclear Infrastructure

GAP Group LTD

Delivering Solutions

HIRE SOLUTIONS

Critical Solutions: The GAP Edge in Nuclear Infrastructure

#trustinGAP

CONTENTS

About GAP Hire Solutions

04

Our Support for Sellafield

16

Nuclear Power in the UK: Today and in the Future

07

Conclusion

18

Depot Network

20

Key Nuclear Projects

08

Nationwide Coverage

22

Navigating Safety Challenges

11

Contact Us

25

Comprehensive Services Tailored for Nuclear Sector

12

Page 02

Contents

Page 03

ABOUT GAP HIRE SOLUTIONS

Survey & Safety

Non- Mechanical

Plant

Tools

GAP Hire Solutions has been a trusted partner in the nuclear sector. With specialised divisions, we offer a one-stop-shop service tailored to the specific needs of the nuclear sector.

Our nationwide depots are equipped to provide comprehensive support for Plant, Tools, Non-Mechanical, Survey & Safety, Welfare Services, Lifting Services, Trenching & Shoring, Pump Services, Environmental Services, Power Generation, and Tanker Services.

Trenching & Shoring

Lifting Services

Welfare Services

Tanker Services

Pump Services

Power Generation

Environmental Services

Page 04

Page 05

NUCLEAR POWER IN THE UK, TODAY AND IN THE FUTURE GAP Hire Solutions is at the forefront of the transition, providing specialist equipment and expertise that meet the nuclear sector’s rigorous safety, efficiency, and sustainability demands.

The UK’s commitment to Net Zero by 2050 has amplified the role of nuclear power in delivering reliable, low-carbon energy.

Page 06

Net Zero by 2050

Page 07

KEY NUCLEAR PROJECTS

GAP Hire Solutions plays a vital role in supporting some of the UK’s most important nuclear projects, providing the equipment and expertise required to meet the sector’s high safety and operational standards.

Hinkley Point C: A landmark project in Somerset, set to provide clean electricity to six million homes. GAP Hire Solutions supports the construction and operational phases with specialised equipment and expert services, ensuring seamless operations with safety and efficiency at the core.

Sellafield: GAP Hire Solutions plays a crucial role in Sellafield’s transition from a historic nuclear site to a cutting-edge centre for decommissioning and waste management. Our specialist equipment and expertise support safe, efficient operations in one of the UK’s most complex nuclear environments.

Page 08

Key Nuclear Projects

Page 09

NAVIGATING SAFETY CHALLENGES

The nuclear industry demands uncompromising safety and precision. At GAP Hire Solutions, we uphold the highest industry standards through:

Certifications: Achilles UVDB (Registered & Audited), RoSPA for accident prevention, FORS for transport safety, and LEEA for lifting compliance. Stringent Compliance: All equipment meets the strictest safety regulations. ISO Certifications: Quality (ISO 9001), Health & Safety (ISO 45001), and Environmental Sustainability (ISO 14001).

With decades of experience and sector-specific expertise, we ensure full compliance while delivering peace of mind to our clients.

Page 10

Navigating Safety Challenges

Page 11

COMPREHENSIVE SERVICES TAILORED FOR THE NUCLEAR SECTOR GAP Hire Solutions is more than a plant and tool supplier. We are partners in progress, providing support designed specifically for the nuclear industry’s unique requirements:

Innovative Solutions: We continually invest in

operations. Through advanced telematics, we provide real-time data on equipment usage and fuel consumption, allowing clients to reduce costs, optimise performance, and minimise environmental impact. These innovations support long-term sustainability goals while enhancing operational efficiency.

cutting-edge technologies and sustainable practices to meet the evolving demands of the nuclear sector. Our low-carbon delivery vehicles and energy-efficient equipment

not only reduce carbon emissions but also help

clients comply with stringent environmental regulations that are critical in nuclear

Community Engagement: We invest in the future workforce through education, training, and employment initiatives, ensuring a pipeline of skilled professionals to support the nuclear sector’s long-term growth.

ESG Strategy: Our Environmental, Social, and Governance (ESG) strategy is at the core of our operations. GAP Hire Solutions actively reduces carbon emissions across its fleet, integrates green technologies,

and supports clients in meeting nuclear sector sustainability targets.

Page 12

Services Tailored for the Nuclear Sector

Page 13

COMPREHENSIVE SERVICES TAILORED FOR THE NUCLEAR SECTOR

Welfare Services Various sizes of mobile welfare units with solar capabilities, fitted with telematics for fuel/solar data monitoring.

Trenching & Shoring Safe excavation solutions with trench boxes, trench sheets, and ancillaries to prevent collapses. Tanker Services A fleet of waste tankers for various waste removal and freshwater delivery, equipped with telematic monitoring for efficiency and CO2 reduction.

Providing a wide range of high-quality plant and tool equipment, maintained as one of the most modern and innovative fleets in the hire industry. We also offer telematics data on larger plant. Plant & Tool Hire

Lifting Services Comprehensive lifting

Survey & Safety Topographical site survey equipment and services from Industry leaders like Trimble and Leica Geosystems.

solutions with equipment complying with LOLER and PUWER regulations. We also offer testing, inspection, and certification of customer- owned equipment.

Pump, Environmental Services & Power Generation Dewatering, drainage solutions, oil & silt removal, pH correction, water quality monitoring, and Stage V compliant

Non-Mechanical Plant

Safety solutions including signage, security fencing, pedestrian barriers, walk boards, and track mats.

generators with hybrid energy storage systems.

Page 14

Services Tailored for the Nuclear Sector

Page 15

OUR SUPPORT FOR SELLAFIELD

• Depot Network: Large depots with equipment storage, delivery fleets, and on-site repair facilities. • Sustainability: Use of electric vehicles for deliveries to reduce carbon emissions. Our specialist teams manage Plant, Tools, Non-Mechanical, Survey & Safety, Welfare Services,Lifting Services, Trenching & Shoring, Pump Services, Environmental Services, Power Generation, and Tanker Services. GAP Hire Solutions has been a dedicated partner to Sellafield for over a decade. Operating from our Whitehaven depot, we provide tailored, multi-division support, including Survey & Safety and other specialist services. Our P4-qualified team ensures expert handling of complex nuclear requirements, reinforcing our role as a trusted partner in one of the UK’s most challenging nuclear projects.

• Lifting Division: LEEA qualified engineers for on-site inspections and certifications. • Plant & Tool Hire: Modern equipment through strategic partnerships. • Welfare Services: Portable toilets, Eco-Hybrid welfare units. • Tanker Services: Nationwide waste management solutions. • Survey & Safety: Latest equipment from top manufacturers and a national repair service. • Certifications: CHAS, Construction Line, SafeHire, FTA, HAE, Achilles UVDB (Registered & Audited), ISO 9001, ISO 14001, ISO 45001, LEEA, PSE, RoSPA. • Experience: Over 50 years in the hire industry, with staff holding P4 Qualifications for Sellafield-specific operations.

Local Presence and Expertise

Capabilities

Divisional Management and Support

Commitment to Quality and Safety

Network and Support

Page 16

Our Support for Sellafield Team

Page 17

CONCLUSION We are proud to be a partner in delivering successful, compliant nuclear projects while supporting communities and safeguarding the environment.

As the UK accelerates its nuclear power agenda, GAP Hire Solutions remains committed to:

Innovation

Sustainability

Safety

Page 18

Page 19

DEPOT NETWORK Each depot includes:

Our depots feature equipment storage yards, our own delivery fleet and on-site repair facilities to minimise downtime.

General Manager

Foreman

Hire Desk Coordinator

Delivery Fleet

Mechanical Fitters

Drivers

Page 20

Depot Network

Page 21

NATIONWIDE COVERAGE With almost 200 strategically

GAP Depots

Nuclear Energy UK Sites

GAP Depots

Fuel Plant AGR Power Station Magnox Power Station Fusion Research PWR Power Station Shutdown/ Decommissioning Reactor

located depots across the country, GAP Hire Solutions ensures seamless communication and collaboration for all your project needs. This extensive network enables multiple depots to support a single project efficiently.

Scotland

North West

North East

Midlands

LOOKING FOR YOUR NEAREST DEPOT? Find it here!

South East

South West

E

London North

London South

• Non-Mechanical • Survey & Safety • Welfare Services • Lifting Services

• Trenching & Shoring • Pump Services • Environmental Services

• Power Generation • Tanker Services • Plant & Tool

Page 22

Page 23

CONTACT US TODAY TO:

Discuss your project requirements and receive tailored solutions.

Request a consultation or quote for our services.

Ready to streamline your nuclear projects with GAP Hire Solutions? Whether planning a network upgrade or requiring ongoing support, GAP Hire Solutions is your trusted partner for success.

Learn more about our comprehensive range of hire solutions and nationwide capabilities.

Reach out to us at 03330 094 153 or visit www.gap-group.co.uk to get started.

Page 24

Page 25

Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13

www.gap-group.co.uk

Made with FlippingBook Digital Publishing Software