3. Understanding of expectations (level of estimate detail/deliverables)
4. Identify “area summary breakouts” required & alternates (List area summary items)
5. Determine if project needs to be broken into bid packages 6. Determine need & level of VDC involvement 7. Establish OST/hand sketches/sketch up models/product data expectations 8. Types of analytics to be utilized 9. Determine potential list of items to be cost modeled 10. Potential CCL items 11. Work with operations team to create site logistic plans (incorporated with VDC) & schedule 12. Are we using the Leopardo Division Project Manual
Y
N
Y Y
N N
13. Is Agtek to be utilized
14. Which organizational model are we using PX or PX and Preconstruction manager
Signatures:
Estimator
Market Leader
Date