LCI #16-2596 - 300 West Huron April 4, 2016 Page 2 of 17
Site: 1. Sitework ...................................................................................................................... 0.70 Acres 2. Structured Parking ........................................................................................................102 Stalls 3. Structured Handicap Parking ............................................................................................4 Stalls
3.0 Design Documents – The estimate is based on the schematic documents prepared by Hartshorne Plunkard Architecture. Refer to the included document list for specific identification of documents.
4.0 Subcontractor Bonds/SDI – Subcontractor default insurance is included.
5.0 Contingency – The estimate excludes all cost associated with Owner, Program and Design Contingencies. The estimate includes a Construction Contingency to be used at the discretion of LCI for construction related unforeseen conditions and is not intended to serve as an Owner and/or Design Contingency. 6.0 Sole Source Exclusions – This estimate assumes that the final bid documents will name three or more manufacturers with applicable model numbers whose product are acceptable under the base bid for each section or work category.
7.0 Sales Tax – This estimate includes all cost associated with State of Illinois sales tax.
8.0 Allowances – Allowances are included in the estimate. Allowances shall cover the total cost of material, labor, and equipment. This includes material delivery, unloading and handling at the site, installation costs, overhead, profit, and all other expenses contemplated for stated allowance.
Weather Conditions 1. Weather Conditions ...........................................................................................................$ 150,000.00
Site 1. Tap/Termination Fees ........................................................................................................$ 40,500.00 2. Relocate Existing Street Light Poles ...................................................................................$ 30,000.00 Architectural 1. Lobby Millwork (Reception Desk and Coffee Bar) ..............................................................$ 65,000.00 2. STC Rated Mullions at Unit Demising Walls (No products specified - $1,000 per demising wall location) ...................................................................................................................... $ 70,000.00 3. Floor Prep ........................................................................................................................... $ 193,295.00 4. 4 th Floor Amenity Level Interior Finishes: a. Gym & Sauna ($40/SF).................................................................................................$ 55,480.00 b. Craft Room ($40/SF) ....................................................................................................$ 20,880.00 c. Demo Kitchen ($50/SF)................................................................................................$ 21,350.00 d. Lounge, Free Play, Fireplace, Restrooms ($50/SF) ......................................................$ 100,450.00 5. Signage ............................................................................................................................. $ 26,900.00 6. Window Washing Equipment .............................................................................................$ 95,000.00 7. 4th Floor Grill Area Equipment ...........................................................................................$ 25,000.00
Structural 1.
Structural Steel for 25 th
Floor Mechanical Screen .............................................................$ 85,000.00
Elevators 1. Cab Finishes ........................................................................................................................ $ 60,000.00
Return to Table of Contents
Made with FlippingBook flipbook maker