LCI #16-2596 - 300 West Huron April 4, 2016 Page 3 of 17
MEP 1. Non Residential Lighting ....................................................................................................$ 232,569.00 2. Core and Shell Card Access System ....................................................................................$ 39,000.00 3. Audio Visual System for Amenity Floor ..............................................................................$ 35,000.00 4. Residential AV Systems...................................................................................................... $ 311,641.00 5. Residential Security Systems ............................................................................................ $ 68,799.00 9.0 Alternates - Alternates shall cover the total cost of material, labor, and equipment. This includes material delivery, unloading and handling at the site, installation costs, overhead, profit, and all other expenses contemplated for stated alternate. 1. Alternate #01 – Exterior wall panels at floors 1-3: a. ROM - Tacktl high performance concrete façade panels Deduct from Base Bid ................................................................................................ ($ 99,717.00)
2. Alternate #02 – Enhanced glazing for acoustical upgrade - at eastern tower façade Add to Base Bid .................................................................................................................. $ 339,566.00
3. Alternate #03 – Enhanced glazing for acoustical upgrade – north and south (assumes the north and south façade windows in the two eastern residential units only) Add to Base Bid .................................................................................................................. $ 332,020.00 4. Alternate #04 – Enhanced glazing for acoustical upgrade - provide alternate enhanced glass at first floor retail Add to Base Bid .................................................................................................................. $ 75,206.00
5.
Alternate #05 – Retail option – vanilla box Add to Base Bid .................................................................................................................. $ 260,570.00
6. Alternate #06 – Retail option – warm dark shell Add to Base Bid .................................................................................................................. $ 95,299.00
7. Alternate #07 – Shower door - frameless basis of design: Architectural Concepts 3/8” clear glass, 36” swing door, or approved equal Add to Base Bid .................................................................................................................. $N/A – Base Bid 8. Alternate #08 – Shower door – change (4) shower doors to Basco “Infinity 1400”, ¼” clear glass, 36” swing door, or approved equal Add to Base Bid .................................................................................................................. $ 226.00 9. Alternate #09 – Alternate hardwood floor finish - white oil, DuChateau, European Oak, 1360 White Oil, smooth with chiseled edge or hand scraped Deduct from Base Bid ........................................................................................................($ 145,615.00)
10. Alternate #010 – Upgrade wall tile to Virginia Tile Calacatta VI – 24” x 24” - powder room sink wall Add to Base Bid ................................................................................................................... $ 1,526.00
11. Alternate #011 – Upgrade wall and floor tile to Virginia Tile Calacatta VI – 24" x 24” - guest bathroom flooring and tub/shower walls Add to Base Bid ................................................................................................................... $ 8,957.00
Return to Table of Contents
Made with FlippingBook flipbook maker