November 14, 2017
Mr. or Mrs. Project Name Address City, State Zip
RE:
LCI #00-0000 Project Name Location/Street Name City, State
Dear Mr. or Mrs.
:
We will provide the labor, material, and miscellaneous equipment required to complete the construction work for the above noted project. We have attached the bid form as requested but would like to add the following qualifications, allowances, and alternates to further clarify our proposal:
TOTAL BASE BID ..........................................................................................................................$
QUALIFICATIONS TO OUR BASE BID 1. All work shall be performed during normal working hours. Leopardo Construction does not include any costs for overtime, premium time, shift work, or material expediting fees. 2. We exclude all winter conditions, including temporary enclosures. 3. All permits and fees are to be paid for by the owner. 4. We exclude Builder’s Risk Insurance. 5. We have not included any additional work or modification of work in-place due to municipal and governing authority reviews, inspections, and comments beyond what is specifically detailed on the Contract Documents. 6. Project commencement and completion date shall be contingent upon issuance of a building permit, fully executed owner contract, verification of project financing, and confirmation of long lead item delivery dates (whichever is the latest). 7. Project start date pending long lead item delivery dates, permits issued and/or contract awarded, whichever is latest. 8. This proposal is based on mutually agreed-to contract terms. 9. All testing and related costs are to be paid for by the owner. 10. All excavations are limited to design depths only. 11. Recommendations indicated in soil boring reports which are not specifically engineered and shown on the drawings are not included in this proposal. 12. All soils encountered are considered to be suitable materials (suitable materials are defined as any soil material in its natural state which is capable of meeting compressive strength and compaction requirements required for building structure). 13. Removal of unforeseen obstructions and filling of resulting voids is not included. 14. Soil remediation/dewatering of any kind is not included. 15. We have not included removal, replacement, or reconnection of existing field drainage tiles. 16. Existing wells or septic tank capping or removal is not included. 17. All owner-supplied products/materials must be delivered to the project site in accordance with our construction schedule.
Made with FlippingBook flipbook maker