LCI Preconstruction & Estimating Training Manual

LCI #00-0000 – Project Name November 14, 2017 Page 2 of 2

18. Please be advised that our proposal pricing is valid for 30 days from date of submission. 19. We do not include furnishing or installing any signage. All structural support and/or repairs associated with the sign installation are to be provided by others. 20. This proposal is based on the Landlord providing temporary electric to this space for use during construction at no cost to the Contractor. 21. We have not included any Landlord fees or charge backs. 22. This proposal does not include X-ray of existing floor slab. 23. This proposal does not include costs for floor prep. 24. The pricing contained herein is based on current construction costs and does not include any escalation.

ALLOWANCES (included in our base bid) 1. ............................................................................................................................................... $

.00

ALTERNATES (to our base bid) 1. Add To Base Bid................................................................................................................$

.00

We have reviewed the following documents: Drawings: A0.0, D.A1, D.A2, D.B1, D.B2, A0.1, A0.2, A0.3, A0.l4, L1.1, L1.2, A1.1, A1.2, A1.3, A1.4, A2.1, A2.2, A2.3, A3.1, A3.2, A3.3, A4.1, A4.2, A4.3, A5.1, A5.2, A6.1, A6.2, A6.3, A6.4, A7.1, A7.2, 7.3, A7.4, A8.1, A8.2, A9.1, A9.2, A9.3, S0.1, S1.0, S0.2, S1.1, S1.2, S1.3, S2.1, M1.1, M1.2, M1.3, M2.1, M2.2, M2.3, P1.1, P1.2, P1.3, P.2.1, P2.2, P3.1, P4.1, E1.0, E1.1, E1.2, E1.3, E1.4, E1.5, E1.6, E1.7, E1.8, E1.9, E2.0, E2.1, E2.2 dated October 26, 2009 issued by Jeffrey Taylor Architect; Addendum No. 1 dated November 14, 2007 issued by Silva Architects.

We look forward to the opportunity to work with you on your upcoming project. If you have any questions regarding this proposal, please contact me at our office.

Respectfully submitted, LEOPARDO COMPANIES, INC.

Project Estimator