LCI #10-2620 – Scottish Rite Cathedral Association, Bloomingdale, IL April 19, 2010 Page 4 of 11
20. Currently essential materials required for your project are experiencing significant industry-wide price fluctuations and/or shortages. As a result of such price fluctuations and shortages, subcontractors and suppliers have been unwilling to guarantee material pricing and delivery dates, and have advised us of the potential for price increases. Our current project budget is subject to the potential increase of material pricing and delays due to material shortages. Leopardo will continue to monitor the portions of the work which have the potential of price increases and delays due to shortages, and advise accordingly. A separate construction contingency can be added to the base contract if required to address this issue. 21. Scope of work includes the use of a tower crane that will encroach upon the air rights of adjacent properties and the public way. We do not include any costs associated with obtaining the right to encroach, whether by legal agreement, cost reimbursement, or other means. 22. Notwithstanding contrary wording in the bid package, the submission of this proposal shall not be construed to be an acceptance of the contract, general conditions or supplementary general conditions, and the submission of this proposal is based upon and subject to the execution of a mutually agreeable modified form of the contract, general conditions and supplementary general conditions. 23. The individual line items contained within the GMP are not guaranteed. Leopardo Companies, Inc. guarantees only the total guaranteed maximum cost and reserves the right to adjust any budget line items at its discretion. 24. Notwithstanding contrary wording of the bid package, the submission of this bid and execution of the contract by the contractor is a representation that the contractor has visited the site and become generally familiar with the local conditions under which the work is to be performed and has correlated personal observations with requirements of the contract documents, but such general familiarity shall not be construed to be a representation that contractor is familiar with conditions which would normally require extensive or detailed testing and/or investigation in order for discovery of such conditions to occur, such as, but not limited to, subsoil, subsurface conditions, concealed conditions, mechanical, plumbing, fire protection, electrical, structural and or other conditions not apparent without detailed architectural, engineering and structural as-built documents or other testing. 25. Leopardo Companies, Inc. does not accept responsibility for indicating the quantities needed for the owner supplied materials. We will however, assist the owner in determining the appropriate quantities required without being held liable for said quantities. 26. Materials that are owner supplied must be on site and distributed accordingly pursuant to the contractors schedule. 27. All of the materials being supplied by the owner are to be unloaded and stored in the building by the owner and distributed per the direction of the contractor so as not to impede the progress of work of others or unduly encumber the work area with materials. 28. Leopardo Companies, Inc. does not include repair of existing code violations or ADA non-compliance issues which are not specifically addressed in the Construction Documents. 29. Existing building engineered surveys are not included. 30. We have not included any firesafing of existing penetrations. 31. We do not include relocating existing building mechanicals (i.e. H.V.A.C., sprinkler piping, electrical piping, plumbing piping, equipment associated with same, etc.), unless specifically noted or shown on the drawings.
Divisions
TYPE IN NARRATIVE/CARIFICATIONS BY DIVISIONS, THEN TRADES
Division 1 General Requirements- Items Provided by Owner (not included in proposal): 1. Surveys/current topography 2. Erosion control/environmental studies 3. Civil, landscaping, architectural, structural, mechanical and electrical design and drawings and design drafting as required.
Return to Table of Contents
Made with FlippingBook flipbook maker