LCI Preconstruction & Estimating Training Manual

Precast Superstructure Study - Lakeview Tower City Apartments - June 4, 2012 - Building Only (Garage Not Included) 12-4598

Light Ga.

Precast / Ext. Mtl Stud / Metal Panel

Description

"C" Channel

Cost/SF

Composite Deck

Cost/SF

Item #

Description

Cost/SF

Item #

Description

Cost/SF

Item #

1 Precast Superstructure

NA

NA

1 Precast Superstructure

7,012,450

26.35

1 Precast Superstructure

7,012,450

26.35

2 CIP Core Walls

713,997

2.68 0.07

714,000

2.68 0.07

2 CIP Core Walls

NA NA NA

2 CIP Core Walls

NIC NA NA

3 Light Ga. - Underside of Balconies 5 Light Ga. Framing / Ext. Sheathing

17,500

17,500

4 Light Ga. - Underside of Balconies

4 Light Ga. - Underside of Balconies

6,283,305

23.61

7,457,540

28.03

5 Light Ga. Framing

5 Light Ga. Framing

6 Precast Exterior Walls

NA

NA NA NA

6 Precast Exterior Walls

1,725,205

6.48 3.04 0.28 3.19

6 Precast Exterior Walls

NA

7 Topping

1,095,835

4.12

7 Topping

808,308

7 Topping

808,308

3.04 0.28 4.70

8 Steel Structure for Common Area - 5th Floor

NA

8 Steel Structure for Common Area - 5th Floor

74,730

8 Steel Structure for Common Area - 5th Floor

74,730

9 Balconies

1,250,625

4.70 0.13

1,250,625

4.70 0.13

9 Balconies (Precast)

847,620

9 Balconies

1,250,625

10 Traffic Coating - Under Balconies

35,000

35,000

10 Traffic Coating - Under Balconies

NA

10 Traffic Coating - Under Balconies

NA

11 Balcony Railing

In Balcony

In Balcony

11 Balcony Railing

285,600 342,550

1.07 1.29

11 Balcony Railing

Included 342,550 3,061,406 1,208,393 3,375,500

12 Fire Safing

NA

NA

12 Fire Safing

12 Fire Safing

1.29

13 Interior DW (All Demising Walls as Precast) 14 Perimeter Mtl. Framing DW, Insll., Sheething

4,909,696

18.45

4,909,696

18.45

13 Interior DW (All Demising Walls as Precast) 14 Perimeter Mtl. Framing DW, Insll., Sheething

3,061,406

11.51

13 Interior DW (All Demising Walls as Precast) 14 Perimeter Mtl. Framing DW, Insll., Sheething

11.51

In Light Ga.

In Light Ga.

NA NA

4.54

15 Exterior Wall Encl. - Panels

3,375,840

12.69

3,375,500

12.69

15 Exterior Wall Encl. - Panels

15 Exterior Wall Encl. - Panels

12.69

16 Ceilings

Included

Included

16 Ceilings

Included

16 Ceilings

Included

17 - Popcorn

NA

NA

17 - Popcorn

NA

17 - Popcorn

NA

18 Crane

592,025 360,000

2.22 1.35

592,025 360,000

2.22 1.35

18 Crane

Included

18 Crane

Included

19 Expansion - Joint - Light Ga. Towers

19 Expansion - Joint - Light Ga. Towers

NA

19 Expansion - Joint - Light Ga. Towers

NA

Total Cost

18,633,823

18,711,886

Total Cost

14,157,869

Total Cost

17,133,962

Building GSF

266,080

266,080

266,080

266,080

Cost/SF

70.03

70.03

70.32

70.32

53.21

53.21

64.39

64.39

Note:

Note:

Note:

Ceilings - Skim coating, DW in corridors and common Included Above

Ceilings - Skim coating, DW in corridors and common

Remove one (1) layer of drywall from each side of corridor

-155,796 -411,696 -124,591 -420,500

-0.6 -1.5 -0.5 -1.6

Included Above

Remove one (1) layer of drywall from ceiling in units

Less skim coating units Unit - Popcorn Ceilings Unit - DW Ceilings Add

-594,658 101,146 516,387

-2.23 0.38 1.94

Less skim coating units Unit - Popcorn Ceilings Unit - DW Ceilings Add

-594,658 101,146 516,387

-2.23 0.38 1.94

Remove one (1) layer of drywall at perimeter

Terra Cotta Savings

Building:

Building:

Building:

Perimeter Partition:

Perimeter Partition:

Perimeter Partition:

Eisen system

Precast with 2-1/2” 25ga studs

6” 16ga studs

One layer of Densglass sheathing on exterior

One layer of type X gypsum

One layer of Densglass sheathing on exterior

Fiberglass insulation with vapor barrier on inside of partition

One layer of type X gypsum interior

One layer of type X gypsum interior

Fiberglass insulation with vapor barrier on inside of partition

Fiberglass insulation with vapor barrier on inside of partition

Level 4 tape finish

Unit separation partitions (party/demising):

Level 4 tape finish

Level 4 tape finish

Precast with 2-1/2” 25ga studs each side of precast

Unit separation partitions (party/demising):

Unit separation partitions (party/demising):

One layer of type X gypsum each side of precast

Precast with 2-1/2” 25ga studs each side of precast

Eisen system

Two layer of type X gypsum each side of precast

Level 4 tape finish Corridor Partition:

One layer of type X gypsum each side of precast

Level 4 tape finish Corridor Partition:

Level 4 tape finish Corridor Partition:

6” 25ga studs

6” 25ga studs

RC1 furring on one side of studs

6” 25ga studs

RC1 furring on one side of studs

One layer of type X gypsum each side of studs

RC1 furring on one side of studs

One layer of type X gypsum each side of studs

Fiberglass insulation

One layer of type X gypsum each side of studs

Fiberglass insulation

Level 4 tape finish

Fiberglass insulation

Ceilings:

Ceilings:

Ceilings:

Gypsum drywall ceiling on drywall grid system at corridors and common areas only (alternates for ceiling in units)

Gypsum drywall ceiling on drywall grid system at corridors and common areas only

Gypsum drywall ceiling on drywall grid system at corridors and common areas only

Units build out

Units build out

Units build out

Partition:

Partition:

Partition:

3-5/8” 25ga studs

3-5/8” 25ga studs

3-5/8” 25ga studs

One layer of type X gypsum each side of studs

One layer of type X gypsum each side of studs

One layer of type X gypsum each side of studs

Level 4 tape finish

Level 4 tape finish

Level 4 tape finish

In-wall backing/blocking as required

In-wall backing/blocking as required

In-wall backing/blocking as required

Ceiling:

Ceiling:

Ceiling:

Gypsum drywall ceiling on drywall grid system at Bathrooms remaining ceilings exposed

Gypsum drywall ceiling on drywall grid system at Bathrooms remaining ceilings exposed.

Gypsum drywall ceiling on drywall grid system at Bathrooms remaining ceilings exposed

Soffit:

Soffit:

Soffit:

Approximately 28lf of 2’x2’ L-soffit to conceal duct work

Approximately 28lf of 2’x2’ L-soffit to conceal duct work

Approximately 28lf of 2’x2’ L-soffit to conceal duct work

Return to Table of Contents

Made with FlippingBook flipbook maker