LCI Preconstruction & Estimating Training Manual

Existing Utilities & Requirement Matrix

Code Compliance Requirements

7 Story Building- 2004 design

High Rise Code Compliance

Comments

NO Services

Existing

4 Story Building

7 story Building

Per design we will provide 3 elevators for garage and 3 passenger elevators for office building serving all 4 floors, One Freight elevator for office

Per design we will provide 3 elevators for garage and 4 passenger elevators for office building serving all 7 floors

Per design we will provide 3 elevators for garage and 4 passenger elevators for office building serving all 7 floors

1

Elevator

building

NA

No Issues

Visual inspection was done by LCI & Plumber Visual inspection was done by LCI & Plumber

2

fine with existing connection

Storm Water

8"

NA

8"

fine with existing Connection No Issues

3

Sanitary

8"

NA

8"

fine with existing connection fine with existing connection No Issues

No provision for central kitchen or retail needs

4

Water Main

NA

10" with existing booster pump Larger booster pump

Larger booster pump

10"

No Issues

we need stand pipe , UP size the pump to 1500gpm, Note : may need to upsize the Fire Main from 6 to 8 inch

existing pump can serve additional garage Plus four story office

we have 6 " main ., we may need 8" main ( still waiting for final calculations from sub)

500 GPM Pump serving existing Garage

we need stand pipe , UP size the pump to 1500gpm,

stand pipe , fire dept connection on roof

NA

5

Fire Protection

Need Increase in One pipe size Vertical run -6"

Need Increase in One pipe size Vertical run -6"

NA

1) Per Drawings-4"

NA

No Issues

We are excluding any and all scope for work for central kitchen , or retail / restaurant needs.

Need to UP Size (4 story design) Water Heaters (for additional fixture counts ) Replace the booster pump with 95 feet head

Need to UP Size (4 story design) Water Heaters (for additional fixture counts ) Replace the booster pump with 95 feet head No need of any booster pump because all major equipment location (in garage basement) Other than Smoke evacuation system , rest of the building design works

Plumbing

Per design Domestic water heater should be fine

Water Heater

Small water heater for garage only

No Issues

New booster pump for 4 story

Small Booster only for garage

6

Booster Pump

No Issues

we have 6"Natural Gas coming from Garage basement to office building

we need to check pressure , We may have to add small booster pump

same as existing condition

7

No Issues

No Issues

Natural Gas

All the equipment selection is based on New energy code requirements

Make up air unit for garage, exhaust fans and unit heaters

We need Smoke evacuation for 4 story building

We need to up size boilers ,and add Smoke evacuation

For garage there is no issue

8

Smoke evacuation

HVAC

We need 4000A service for Building , design shows 3000A, we have to include fire alarm system for High Rise & 250KW Generator

For garage 1200 A, will cover, we are carrying allowance for some existing code compliance items, NO Generator

Up size the Service to 6000 A,and Fire alarm for high rise, and 500 KW Generator

Up size the Service to 6000 A,and Fire alarm for high rise, and 500 KW Generator

Garage have 1200 A

Fire alarm Per High Rise codes & Generator

9

Electrical

Per code ,we need Generator , because of fire pump

No Generator

Add 250 KW Generator (Natural )

Per design 500 KW Gen

Per design 500 KW Gen

10

No Issues

Generator

We have allowance for empty conduit We have allowance for empty conduit

We have allowance for empty conduit We have allowance for empty conduit

We have allowance for empty conduit We have allowance for empty conduit

No service

11

Not Required

No Issues

Telephone

No service

12 Data - Fiber

Not Required

No Issues