Soft Cost Impact?
NOTES:
LEED-NC Version 2.2 Registered Project Checklist Allied Tube & Conduit - Preliminary Feasibility Study - for budget purposes only Harvey IL
$ $
18,000 120,320
REGISTRATION and CERTIFICATION D/B PREMIUM for ARCH & PE Time
SUBTOTAL
$
138,320
Use LCI National member status discount
Yes ? No
Sustainable Sites
14 Points Hard Cost Impact?
NOTES:
9 3 2
Y 1
Construction Activity Pollution Prevention
Prereq 1 Credit 1 Credit 2 Credit 3
Required
Site Selection
Requires confirmation on water body
1 1 1 1 1 1 1 1 1 1 1 1 1 1
1
Development Density & Community Connectivity
Requires further study
1 1 1 1
Brownfield Redevelopment
Need confirmation of bus stop locations
Credit 4.1 Alternative Transportation , Public Transportation Access Credit 4.2 Alternative Transportation , Bicycle Storage & Changing Rooms Credit 4.3 Alternative Transportation , Low-Emitting and Fuel-Efficient Vehicles
$
37,500
See alternate plan dated 7/21/08
1
Requires further zoning code review
Credit 4.4 Alternative Transportation , Parking Capacity 1 Credit 5.1 Site Development, Protect or Restore Habitat
1
Depends on Final Detention design
Credit 5.2 Site Development, Maximize Open Space Credit 6.1 Stormwater Design, Quantity Control Credit 6.2 Stormwater Design, Quality Control
1
Need to utilize filtration at drainage strucutres.
1 1 1 1
$ $ $
20,000
-
Assumes Concrete Paving Alt.
Credit 7.1 Heat Island Effect, Non-Roof Credit 7.2 Heat Island Effect, Roof
283,250 17,500 358,250
White Adhered TPO Premium from Fully Adhered
Light Pollution Reduction
$
Lighting controls
Credit 8
SUBTOTAL
$
Yes ? No
Water Efficiency
3 1 1
5 Points
1 1
Assumes indigenous xeriscape Assumes indigenous xeriscape
Credit 1.1 Water Efficient Landscaping , Reduce by 50%
1 1 1 1 1
Credit 1.2 Water Efficient Landscaping , No Potable Use or No Irrigation
1
Innovative Wastewater Technologies
Credit 2
1
$
12,000
utilize lo-flow fixtures
Credit 3.1 Water Use Reduction , 20% Reduction Credit 3.2 Water Use Reduction , 30% Reduction
1
possible, but difficult to achieve
SUBTOTAL
$
12,000
Yes ? No
Energy & Atmosphere
7 2 8
17 Points
Y Y Y
Fundamental Commissioning of the Building Energy Systems
$
20,000
Can be unrelated project team member
Prereq 1 Prereq 2 Prereq 3 Credit 1 Credit 2 Credit 3 Credit 4 Credit 5 Credit 6
Required Required Required
Minimum Energy Performance
No Charge No Charge
Fundamental Refrigerant Management Optimize Energy Performance On-Site Renewable Energy Enhanced Commissioning Enhanced Refrigerant Management
3 1 6
$ $ $ $ $ $ $
95,000
detailed energy modeling required
1 to 10
1 2
-
solar hot water system after incentives $40K
1 to 3
1 1 1 1
12,000
independent third party
1 1 1 1
7,500
R410A or R407C utilized/derates eqmt
Measurement & Verification
12,000 38,108 184,608
Green Power
Estimate based on indesutry norms
SUBTOTAL
continued…