LCI Preconstruction & Estimating Training Manual

Soft Cost Impact?

NOTES:

LEED-NC Version 2.2 Registered Project Checklist Allied Tube & Conduit - Preliminary Feasibility Study - for budget purposes only Harvey IL

$ $

18,000 120,320

REGISTRATION and CERTIFICATION D/B PREMIUM for ARCH & PE Time

SUBTOTAL

$

138,320

Use LCI National member status discount

Yes ? No

Sustainable Sites

14 Points Hard Cost Impact?

NOTES:

9 3 2

Y 1

Construction Activity Pollution Prevention

Prereq 1 Credit 1 Credit 2 Credit 3

Required

Site Selection

Requires confirmation on water body

1 1 1 1 1 1 1 1 1 1 1 1 1 1

1

Development Density & Community Connectivity

Requires further study

1 1 1 1

Brownfield Redevelopment

Need confirmation of bus stop locations

Credit 4.1 Alternative Transportation , Public Transportation Access Credit 4.2 Alternative Transportation , Bicycle Storage & Changing Rooms Credit 4.3 Alternative Transportation , Low-Emitting and Fuel-Efficient Vehicles

$

37,500

See alternate plan dated 7/21/08

1

Requires further zoning code review

Credit 4.4 Alternative Transportation , Parking Capacity 1 Credit 5.1 Site Development, Protect or Restore Habitat

1

Depends on Final Detention design

Credit 5.2 Site Development, Maximize Open Space Credit 6.1 Stormwater Design, Quantity Control Credit 6.2 Stormwater Design, Quality Control

1

Need to utilize filtration at drainage strucutres.

1 1 1 1

$ $ $

20,000

-

Assumes Concrete Paving Alt.

Credit 7.1 Heat Island Effect, Non-Roof Credit 7.2 Heat Island Effect, Roof

283,250 17,500 358,250

White Adhered TPO Premium from Fully Adhered

Light Pollution Reduction

$

Lighting controls

Credit 8

SUBTOTAL

$

Yes ? No

Water Efficiency

3 1 1

5 Points

1 1

Assumes indigenous xeriscape Assumes indigenous xeriscape

Credit 1.1 Water Efficient Landscaping , Reduce by 50%

1 1 1 1 1

Credit 1.2 Water Efficient Landscaping , No Potable Use or No Irrigation

1

Innovative Wastewater Technologies

Credit 2

1

$

12,000

utilize lo-flow fixtures

Credit 3.1 Water Use Reduction , 20% Reduction Credit 3.2 Water Use Reduction , 30% Reduction

1

possible, but difficult to achieve

SUBTOTAL

$

12,000

Yes ? No

Energy & Atmosphere

7 2 8

17 Points

Y Y Y

Fundamental Commissioning of the Building Energy Systems

$

20,000

Can be unrelated project team member

Prereq 1 Prereq 2 Prereq 3 Credit 1 Credit 2 Credit 3 Credit 4 Credit 5 Credit 6

Required Required Required

Minimum Energy Performance

No Charge No Charge

Fundamental Refrigerant Management Optimize Energy Performance On-Site Renewable Energy Enhanced Commissioning Enhanced Refrigerant Management

3 1 6

$ $ $ $ $ $ $

95,000

detailed energy modeling required

1 to 10

1 2

-

solar hot water system after incentives $40K

1 to 3

1 1 1 1

12,000

independent third party

1 1 1 1

7,500

R410A or R407C utilized/derates eqmt

Measurement & Verification

12,000 38,108 184,608

Green Power

Estimate based on indesutry norms

SUBTOTAL

continued…

Return to Table of Contents

Made with FlippingBook flipbook maker