Yes ? No 4 3 6
Materials & Resources
13 Points
Y
Storage & Collection of Recyclables
Prereq 1
Required
1 Credit 1.1 Building Reuse , Maintain 75% of Existing Walls, Floors & Roof 1 Credit 1.2 Building Reuse , Maintain 100% of Existing Walls, Floors & Roof 1 Credit 1.3 Building Reuse , Maintain 50% of Interior Non-Structural Elements Credit 2.1 Construction Waste Management , Divert 50% from Disposal 1 Credit 2.2 Construction Waste Management , Divert 75% from Disposal
1 1 1 1 1 1 1 1 1 1 1 1 1
1
Discuss with Demolition contractor
1
Credit 3.1 Materials Reuse , 5% Credit 3.2 Materials Reuse ,10%
1
1
structural steel is the key
Credit 4.1 Recycled Content , 10% (post-consumer + ½ pre-consumer) Credit 4.2 Recycled Content , 20% (post-consumer + ½ pre-consumer) Credit 5.1 Regional Materials , 10% Extracted, Processed & Manufactured Regionally Credit 5.2 Regional Materials , 20% Extracted, Processed & Manufactured Regionally
1
see above, also light gauge metal and gyp.
1
Also see innovations section
1
1
Rapidly Renewable Materials
Credit 6 Credit 7
1
Certified Wood
$ $
15,000 15,000
may need to purchase FSC doors
SUBTOTAL
Yes ? No
Indoor Environmental Quality
10 3 2
15 Points
Y Y 1 1
Minimum IAQ Performance
Required Required
Prereq 1 Prereq 2 Credit 1 Credit 2
Environmental Tobacco Smoke (ETS) Control
Outdoor Air Delivery Monitoring
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
15000 CO2 sensors in high occupancy areas
Increased Ventilation
Likely no charge
1 1 1 1 1
Credit 3.1 Construction IAQ Management Plan , During Construction Credit 3.2 Construction IAQ Management Plan , Before Occupancy Credit 4.1 Low-Emitting Materials , Adhesives & Sealants
$
5,000
note: flushout period or testing
Credit 4.2 Low-Emitting Materials , Paints & Coatings Credit 4.3 Low-Emitting Materials , Carpet Systems
1
Credit 4.4 Low-Emitting Materials , Composite Wood & Agrifiber Products
1
Indoor Chemical & Pollutant Source Control
$
5,000
derates equipment slightly / no charge
Credit 5
1 1
Credit 6.1 Controllability of Systems , Lighting Credit 6.2 Controllability of Systems , Thermal Comfort
expensive
1 1
25000 enthalpy sensors required
Credit 7.1 Thermal Comfort , Design Credit 7.2 Thermal Comfort , Verification
no cost if meet M & V plan reqmt's
1 Credit 8.1 Daylight & Views , Daylight 75% of Spaces 1 Credit 8.2 Daylight & Views , Views for 90% of Spaces
SUBTOTAL
$
50,000
Yes ? No
Innovation & Design Process
3 2
5 Points
1
$ $
1,500 1,500
Credit 1.1 Innovation in Design : Green Housekeeping Plan Credit 1.2 Innovation in Design : Green Education Plan
1 1 1 1 1
1
1
Discuss Leopardo's idea Discuss Leopardo's idea
Credit 1.3 Innovation in Design : Locally sourced electrical conduit/tubing/ & fire protection pipe
1
Credit 1.4 Innovation in Design : Process Heat Recovery
1
No Charge
LEED ® Accredited Professional
Credit 2
SUBTOTAL
$
3,000
Yes ? No
$
761,178
GRAND TOTAL BUDGET
Project Totals (pre-certification estimates)
36 14 19
69 Points
Certified 26-32 points Silver 33-38 points Gold 39-51 points Platinum 52-69 points
Return to Table of Contents