LCI Preconstruction & Estimating Training Manual

Yes ? No 4 3 6

Materials & Resources

13 Points

Y

Storage & Collection of Recyclables

Prereq 1

Required

1 Credit 1.1 Building Reuse , Maintain 75% of Existing Walls, Floors & Roof 1 Credit 1.2 Building Reuse , Maintain 100% of Existing Walls, Floors & Roof 1 Credit 1.3 Building Reuse , Maintain 50% of Interior Non-Structural Elements Credit 2.1 Construction Waste Management , Divert 50% from Disposal 1 Credit 2.2 Construction Waste Management , Divert 75% from Disposal

1 1 1 1 1 1 1 1 1 1 1 1 1

1

Discuss with Demolition contractor

1

Credit 3.1 Materials Reuse , 5% Credit 3.2 Materials Reuse ,10%

1

1

structural steel is the key

Credit 4.1 Recycled Content , 10% (post-consumer + ½ pre-consumer) Credit 4.2 Recycled Content , 20% (post-consumer + ½ pre-consumer) Credit 5.1 Regional Materials , 10% Extracted, Processed & Manufactured Regionally Credit 5.2 Regional Materials , 20% Extracted, Processed & Manufactured Regionally

1

see above, also light gauge metal and gyp.

1

Also see innovations section

1

1

Rapidly Renewable Materials

Credit 6 Credit 7

1

Certified Wood

$ $

15,000 15,000

may need to purchase FSC doors

SUBTOTAL

Yes ? No

Indoor Environmental Quality

10 3 2

15 Points

Y Y 1 1

Minimum IAQ Performance

Required Required

Prereq 1 Prereq 2 Credit 1 Credit 2

Environmental Tobacco Smoke (ETS) Control

Outdoor Air Delivery Monitoring

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

15000 CO2 sensors in high occupancy areas

Increased Ventilation

Likely no charge

1 1 1 1 1

Credit 3.1 Construction IAQ Management Plan , During Construction Credit 3.2 Construction IAQ Management Plan , Before Occupancy Credit 4.1 Low-Emitting Materials , Adhesives & Sealants

$

5,000

note: flushout period or testing

Credit 4.2 Low-Emitting Materials , Paints & Coatings Credit 4.3 Low-Emitting Materials , Carpet Systems

1

Credit 4.4 Low-Emitting Materials , Composite Wood & Agrifiber Products

1

Indoor Chemical & Pollutant Source Control

$

5,000

derates equipment slightly / no charge

Credit 5

1 1

Credit 6.1 Controllability of Systems , Lighting Credit 6.2 Controllability of Systems , Thermal Comfort

expensive

1 1

25000 enthalpy sensors required

Credit 7.1 Thermal Comfort , Design Credit 7.2 Thermal Comfort , Verification

no cost if meet M & V plan reqmt's

1 Credit 8.1 Daylight & Views , Daylight 75% of Spaces 1 Credit 8.2 Daylight & Views , Views for 90% of Spaces

SUBTOTAL

$

50,000

Yes ? No

Innovation & Design Process

3 2

5 Points

1

$ $

1,500 1,500

Credit 1.1 Innovation in Design : Green Housekeeping Plan Credit 1.2 Innovation in Design : Green Education Plan

1 1 1 1 1

1

1

Discuss Leopardo's idea Discuss Leopardo's idea

Credit 1.3 Innovation in Design : Locally sourced electrical conduit/tubing/ & fire protection pipe

1

Credit 1.4 Innovation in Design : Process Heat Recovery

1

No Charge

LEED ® Accredited Professional

Credit 2

SUBTOTAL

$

3,000

Yes ? No

$

761,178

GRAND TOTAL BUDGET

Project Totals (pre-certification estimates)

36 14 19

69 Points

Certified 26-32 points Silver 33-38 points Gold 39-51 points Platinum 52-69 points