Job #14-0034
Action Codes:
A = Approved, incorporate comment
Elm & State
X = Disapproved, disregard comment R = Architect / Engineer to review and reply
Plan Review Form
Status Code Cleanup of Documents
"C"
February 18, 2014 - Team Meeting
Scope Increase
"D"
Scope Change
"S"
Constructability Issues
"B"
Delegated Designer
"E"
Trade/ Spec Section Status Drawing Location
Description
Action Code
Team Comments
Critical
Detail 3 is there a concern with the sprinkler head freezing if the shade is closed on a cold night? R
B
A4.01C
SCB to be review
1
Will review with Eng. / Lighting / LTSW- Team Determined this is possible
2
B B B B C C C C C C C C C C C C
A4.02B
Detail 6 – Light under coping required? Can it be re-lamped?
R R R
A4.02B/4
We would recommend that all in-laid gutters MUST have a full membrane liner
Agreed
3 074214
4
A4.07
Planter curbs are set on the insulation?
SCB to be review
Indicates light pole and stop light to remain, we need to coordinate with site logistic and City of Chicago X
5 6 7 8 9
C1.01 A2.00 A2.01
LCI Met with CDOT 2/18/14. Infrastructure to Remain.
Show outline of storm trap in plan.
R R R R R R R R R R R R
SCB to Incorporate into Drawings SCB to Incorporate into Drawings
Show location of storm trap access manhole.
A2.06 & A2.07 A2.06 & A2.08 A2.06 & A2.09 A2.06 & A2.10 A2.06 & A2.11 A2.06 & A2.12 A2.06 & A2.13 A2.06 & A2.14 A2.06 & A2.15 A2.06 & A2.16
Confirm location of balconies that require pavers.
SCB to review SCB to review SCB to review SCB to review SCB to review SCB to review SCB to review SCB to review SCB to review
Pavers & Waterproofing at Balconies N.W. Balcony - Levels 6, 16 Pavers & Waterproofing at Balconies West Balcony - Levels 6, 16 Pavers & Waterproofing at Balconies East Balcony - Levels 6,16 Pavers & Waterproofing at Balconies N.E Balcony - Levels 6 & 16 Pavers & Waterproofing at Balconies N.E. Balcony - Level 11 & 21 Pavers & Waterproofing at Balconies S.E Balcony - Levels 6 & 16 Pavers & Waterproofing at Balconies S.W. Balcony - Level 11 & 21 Pavers & Waterproofing at Balconies West Balcony - Levels 11 & 21 Pavers & Waterproofing at Balconies East Balcony - Levels 11, 21
10 11 12 13 14 15 16 17
Below existing building To be reviewed with energy code. Some light is very important.
18 19
C C
A2.06A
At levels below the building to the east make all the east glass insulated spandrel? Coordinate the wheel chair space in the stair well with the small scale plans.
R R
A2.08
SCB to coordinate.
Weeping through the curbs per SCB. Can roof drains be added to eliminate CIP topping.
20 21 22 23
C C C C
A2.10 A2.10 A2.11 A2.11
Does roof drainage work through planted areas? Develop detail of davit base below pavers.
R R R R
Davit being eliminated.
Columns along column line 4.9 extend into the curtain wall framing
SCB to coordinate.
Coordinate size of lift out slab with MEP's
Size to be 4'x4'
South elevation shows one continuous vertical panel at column line 4.9. How often will we be able to provide a horizontal seam at both south and north elevations? R Horizontal metal panel "bands" at floors 6, 11, 16 and 21 show one continuous horizontal metal panel at slab edge. How often will we be able to provide a vertical seam at metal panels? R
24
C
A3.01
Being developed. Floor to floor seams.
Being developed. Work with pairing of glass module. 2 Units Coating to be defined by SCB. LCI to review CMU vs. CIP options for east and north walls.
25
C
A3.01
26 27 28
C C C
A3.02 A3.02
East elevation at the parking levels delete EIFS and coat the concrete.
R R R
Missing details 4/A4.05, 5/A4.02C Please provide details 11 & 12.
Agreed
A4.01B
Agreed Radiant cabling. SCB feels the cabling / insulation to be over ceiling at balcony. Daccord requested cable to be moved to top of the slab. LCI to Provide Budget Pricing for the Radiant Cabling.
29
C
A4.01B
What is dashed line indicating under balcony slabs
R
Detail 4. Shows a 1" in and out concrete tolerance. Detail does not provide a big enough air space to accept a 1" out tolerance for concrete. Slab edge safing will hit 1/4" glass. R
To be reviewed for Concrete Tolerance vs. Window Wall Tolerance. Spec to be Adjusted Accordingly
30
C
A4.01B
31
C
A4.01B/4
Detail 4 - Thermal conductivity issue. Cold can transmit from balcony to occupied space. R There needs to be metal framing, sheathing, and weather barrier shown. The weather barrier should have an integral flashing to weep the water out of the cavity behind the metal panels before it enters the space above the plaster soffit R
SCB to review Detail #8 for conductivity.
32 074214
C C C
A4.01B/7 A4.01C/3
SCB to review and detail. For CD documents SCB to review and detail. For CD documents SCB to review and detail. For CD documents
33 34
Develop detail for tub deck at mullion condition.
R R
A4.02B & C
Develop detail along wall sections, tagged but not developed.
Need to develop details at the canopy and connection details. Also the metal panel to glass conditions. R
35 36
C C
A4.02B/4 A4.02C/4
SCB to review and detail. For CD documents SCB to review and detail. For CD documents
Provide detail for expansion joint detail.
R
37 38 39 40 41
C C C C C C C C C
A4.03B A4.03B
Where are the louvers located in the storefront? Use Kawneer 1600 or similar window wall. R
To be shown. Daccord felt bid impact Daccord directed to be removed.
Develop further the detail for the Brisse Soleil - Detail 4/A4.03B
R
A4.03B/7
Develop detail at base of wall.
Stone not to be specialized for this condition. Over pump room. SCB to Review extent SCB to review and detail. For CD documents SCB to review and detail. For CD documents SCB to review and detail. For CD documents SCB to review and detail. For CD documents SCB to review and detail. For CD documents
A4.03C
Plan 1 show extent of water proof membrane. Detail 6 - Railing target is miss identified.
R R
A4.05
The weather barrier should have an integral flashing to weep the water out of the cavity behind the metal panels before it enters the space above the plaster soffit R
42 074214
A4.05 / 1,2 & 6 A4.05 / 6 & 7
43 44 45
Develop detail of metal panel integration with glazing system.
R R R
A4.05/ 6& 7
Develop detail of metal panel to slab edge.
A4.05/5
Develop details where glazing system meets slab edge.
To be coordinated. Return air return. Daccord to forward information to SCB. Note to be coordinated with Owner. SCB to Remove Note See email From Civil 2/17. This is done often, sometimes even providing a water service w/ a larger diameter than the main. In this case, the City will make the actual 8” to 8” connection & the contractor will bring the service piping from the City-made connection back to the building. See email from Civil 2/17. This can be adjusted to be further from the door. If no overflow grate in the sidewalk is desired, then an underground overflow pipe can be installed, though this will require a separate storm sewer connection be made to the main in State Street which will add cost. There is no engineering problem w/ showing either, just whatever the owner prefers. Cosentini - Acknowledged to Be Incorporated Cosentini - Acknowledged to Be Incorporated Cosentini to Follow Engineering Plus Documents for Location and Quantity
46
C
A7.06
Review drawings for ceiling height changes in south unit.
R
47
C
C3.01
Water service connection will not be coordinated by owner.
R
48
C
C3.01
Can you connect a new 8” water service to an 8” water main?
R
49 50 51
C C C
C4.01 E2.08 E2.08
Storm detention over flow very close to storefront. How will this work?
R R R
Locate electrical panel for the unit in the laundry room.
Coordinate power for TV locations with furniture plans and LV drawings.
52 53
C C
E2.08 E4.10
Power and cable outlets to be for wall mounted TV’s.
R R
Voided Item
Void
Lights witch to provide updated drawings. Cosentini to Coordinated Electrical with Lighting Drawings
X
54
C
E-General
Lighting is not coordinated with electrical
R
Return to Table of Contents
11/4/2016
1
9
Made with FlippingBook flipbook maker