LCI Preconstruction & Estimating Training Manual

Sprinkler heads shown on drawings are not correct; there will be more heads needed per code. R

FP is design build. Arch. Drawings to show all.MEP and Lighting to clarify architectural intent.

55

C

FP

56 57

C C

General General

Add LCI to cover sheet as contractor. Date all drawings the same date.

R R

OK, just on coversheet SCB to Add

SCB to Add

Acknowledged Drawing Back Grounds to be Coordinated

58

C

General

The drawings back grounds are not consistent in all disciplines.

R

There is much coordination required between disciplines. This is to be expected with a DD set but some of the drawings will need to be coordinated. The lighting and electrical drawings require more coordination. R The interior drawings do not contain enough detail. More and better detailing is required for lobby desk and wall panels. R

Base level of lighting to be established. SCB to coordinate light switch. Coordinate with Cosentini. Statement confirmed by Team. GLP to Review Detailed Comments and Revise ID Drawings

X

59

C

General

X

60 61

C C

General

ID2.01

Coordinate package shelf in mail room with Architectural.

R

Daccord directed SCB & GLP to coordinate.

Cove lighting is described Fabric Wrapped Panel wall in corridor 101, west wall of entry vestibule 100A, and Elevator Vestibule(s). What is extent of cove detail? R

X

62

C

ID2.01

Need section -GLP to Define Section

Located in Lobby. No cove lighting at knife edge.GLP to Define

63

C

ID2.01

Drywall – note typical Gordon ‘knife-edge’ detail. Verify inclusion. 30 ID 8.1

R

64 65 66 67 68 69 70 71 72

C C C C C C C C C

ID2.01 ID2.01 ID2.01 ID2.03 ID2.03 ID2.05

Doors – Note Concealed Panel Wood Doors at two locations - are these millwork doors? R

GLP Confirmed these are Millwork Doors LCI Indicated this is Defined (Closed)

Define Finish PL-1. (Color)

R R

Need section / detail through glass wall including head condition.

SCB and GLP to develop

Review that vertical shafts/distribution are adequately sized to allow for MEP installations. R

SCB to Review

Voided item

R R

Coordinate the elevator vestibule with the architectural back ground drawings?

SCB to confirm GLP to Utilize Same Back Ground

X

Remove/void detail 03 showing built-in millwork desk which was agreed to be a furniture piece. R

X

ID3.1

GLP to Delete in Revised Drawing Issuance

ID3.2/13 ID3.2/31

Develop section / detail at light cove. At entry vestibule Develop sill, jamb, and head details for wood door.(Entry)

R R

GLP to Detail GLP to Detail

X

X

Tile on face of vertical support that supports the slab. Slab on top, tile on vertical. GLP to Detail per agreed detail. To be Issued on GLP Revised Drawings. GLP to Show on Plan and Wall Elevation the design intent for Tile Pattern (Layout)

Again very little has changed except that detail 07 has been added to describe the master bath shower. The detailing of the shower bench support needs to be shown how we have agreed. There would be some framing to support the slab bench and that there would be an overhang and the ‘front’ below the slab bench would be tiled? R There are a lot of details “to be coordinated” with Light Switch…do the specified lights match their design approach. R

X

73

C

ID5.1

74 75

C C

ID5.1 ID5.1

Confirmed.

Toilet accessories locations?

R

GLP to add to elevations

X

12" Diameter duct now shown. Need to be coordinated with MEP. Does this fit in the cabinet. SCB to draw.DAC to issue cut sheet of Hood to SCB

76 77

C C

ID-5.3/12

Please provide section cut at kitchen hood location Seems like elevation 7 and 8 tags are reversed.

R R

ID5.4

GLP to Adjust Tags

X

X

78 79 80

C C C

ID6.1 ID6.1 ID6.2

Where are hardware sets 10 & 11? Where are Door types F & G?

R R R

10 at Lobby. 11 at Entry.GLP to add Tag for Reference

GLP to add tag GLP to Remove

X

Note: No Lighting info present – remove from drawing title.

X

GLP to confirm (Front Door) Owner indicated the Front Door will be a budget allowance of $30k for Door including all Hardware and Operator. GLP to design to this budget allowance

X

81

C

ID8.1

Where is detail 36?

R

Detail #1 - Level 5 - An additional row of pavers may be needed between spa and planting bed, to allow bed & spa maintenance and also keep debris out of spa (north side of spa). R Level 5 - Depending on the sun pattern & neighboring buildings, there may need to be more shade tolerant plants used in some areas if they get little sunlight R Level 23 - Looks straightforward, but if intent for sod is a dog run area, they may want to consider artificial Pet Turf (cheaper & more durable than 8” deep soil system with sod) R Has wind uplift been considered for 23, 24 & roof…green roof may require wire mesh tie downs. R Can the lobby air handler be moved closer to the lobby and reduce the duct runs? Above the parking ramp? R No duct base building duct work in the tenant space. Relocate supply air duct for lobby unit. R AHU-1 shows 30 KW electric heating coil & M-4.02 schedule shows hot and chill water coils. Please confirm the selection. R

82

C

L1.02

SCB to Issue to Landscaper for Comment

83

C

L1.02/1

SCB to Issue to Landscaper for Comment

84

C

L1.03/1

SCB to Issue to Landscaper for Comment

85

C

L1.04

CSA to advise

86

C

M2.01

Cosentini to advise.

87

C

M2.01

Cosentini to advise.

88

C

M2.01

Correct as stated. Elect. Coil is required for reheat

Garage Plenum heaters are considerably larger than standard unit heaters ( symbol shown on drawings) . They can be up to 18” tall. Please verify that this space has adequate room R

89 90

C C

M2.02 M2.05

To be Coordinated in CD's

Coordinate locations of CHW and Gas risers out of corridor.

R

Coordinate with 5th floor mech. Drawing M2.05

91

C

M2.06

Coordinate 12” dia kitchen exhaust duct with cabinets. Will this fit in the cabinet?

R

Cosentini to confirm. DAC to Issue Cut Sheet of Hood

Per Chris O. Return grills high on walls. Move to walls. Cosentini/SCB to Coordinate and Relocate to Walls Cosentini to review. Daccord to send Cosentini markup drawings. Cosentini to review. Daccord to send Cosentini markup drawings.

92

C

M2.06

Location of return air grills in ceilings is not acceptable. Relocate RA grills high on the walls. R

93

C

M2.06

Review drawings for duct routing clarifications.

R

94 95

C C

M2.06 M2.11

Review drawings for ceiling height changes in south unit. Relocate KE fan to penthouse roof and shorten all the duct runs.

R R

Cosentini to review.

The MA ducts need to be aligned vertically from roof down so ducts are not moving all over in plan. R

96

C

M2.11

Cosentini to Review

Review specifications CSA indicated potential issues with Friction Clamps. To be reviewed and Coordinated with Structural for Clarification on Design for Friction Clamps for floor loading

97

C

M3.02

There are too many anchors. We need information / detail for expansion compensation. R Shows six (9) Bathroom Exhaust risers for residential unit, as per Architectural floor lay out (refer A2.06) we have eight (8) toilets for typical residential floor, can we eliminate one bathroom exhaust riser. Please confirm R

98

C

M3.03

SCB to correct

Cosentini and SCB to confirm. Cosentini to markup risers. One PRV in penthouse.

X

99

C C

M-General M-General

Please provide Natural gas riser sizes for residential units Kitchen Exhaust riser assumed to be galvanized? Please confirm

R R

100

Galvanized

General Note: Please provide all the Mechanical equipment electrical requirements on electrical drawings Missing Parking garage design - ( Garage Drain & Piping) Coordinate Hot water Zone#1 & 2 and CW & HW piping location Need coordination between P2.12 & MP2.11 roof plan for routing and spaces

101 102 103 104

C C C C

M-General

R R R R

Cosentini to Provide on CD Documents

P2

Cosentini to Indicate

P2.05 P2.12

Cosentini to Provide on CD Documents Cosentini to Provide Clarification

CSA to Show on Structural Plan Coordinate with architectural TBD - Also LCI to establish digging of test pits. LCI to work with Daccord to establish depth of existing foundations. And Locate Test Hole Locations No caisson shafts to within 2' of CTA tunnels. Convexity / Team - Shaft size including sleeves to be determined. CSA Requested LCI Provide Total Diameter including Permanent Liner

105

C

S2.01

Locate storm trap slab.

R

106

C

S-General

Confirm that underpinning of the building to the north will not be required.

R

107

C

S-General

Team to review CTA - Caisson Protocol

R

Return to Table of Contents