The Extensive Garden Roof specification section is written based on a full system warranty with American Hydrotech as their basis of design. In section 1.5 (system description) it clearly states the components for the green roof are for a built up system like American Hydrotech’s including water retention mat, root barrier, filter fabric etc. Whereas both the landscape and architectural drawings reference a “ 12”W x 24”L x 4.25” depth pre-vegetated Sedum Green Roof Tray system Typ.” This is not a green roof system that American Hydrotech offers and is contrary to the specs. There is an emphasis in the specs on storm water management including the requirement for a comprehensive Storm Water Performance Report (which Hydrotech will provide for their system). This combined with the spec for an overall system warranty leads me to believe that the spec is more reflective of the actual desired design for the green roof. Overall the built up system with the American Hydrotech full system warranty would involve more cost than a tray option. R Intensive roof garden systems are shown on drawings at 5 th level. The 329700 Extensive garden system section needs to be modified to include the intensive roof garden requirements. R
329700
C
Spec.
108
SCB to review
329700
C
Spec.
109
SCB to review
C
Spec.
110 329700
Voided item
R
111 033800
C
Spec.
Review Surface treatment and repair - Paragraph 3.6 - Cracks not defined dimensionally. R Section 2.3C calls out for the base flashing to be Neoprene Flashing and SBS Flashing and section describes the installation of the Neoprene Flashing and SBS Flashings. Section 3.7a does not reflect the use of the required flashing products and need to be change to accurately reflect the specified products. R For the non-insulated panel application at the canopy soffits, Centria in the spec. but don’t really call out a specific panel. Everybody makes a concealed fastener soffit panel though and there’s nothing to them so that’s no big deal. Morin, Petersen Alum, Fabral, etc. Define a module width and gauge/type of material. R The metal panels are a rain screen system. In no case should the primary sealant line be to the face of the metal panels. The adjacent systems need to either be sealed to the weather membrane or to flashings which are integral to the weather membrane R Specification section 085113 Aluminum Window Wall, 2.1 Manufacturers listed Cupples, Elston, and Sota. Can Wausau added to this section? R No information about pipe martial is specification. We are assuming Sch#40 & 10 black pipe for complete project R For the Insulated approach, at the 5 th floor fascia soffit. Northclad AL series rainscreen is called out over insulation, but that panel system can be pretty pricey. You could probably just go with an aluminum composite material (ACM) panel rainscreen system here and save some money. The panels themselves aren’t insulated in either system, so you end up insulated behind them either way - whether it be with an insulated wall, or putting rigid insulation between Z girts, and hanging the panels on the girts. R Regarding Type A unit Accessibility requirement. Are we to include any ADA requirement for countertops, cabinets, and appliance in our current budget. We didn’t expect so but wanted to confirm. R Confirm that the column enclosure at Columns 4.9 and A is cladded on all four sides by metal panel. R
CSA will define criteria
112 071413
C
Spec.
SCB to review and clarify.
113 074214
C
Spec.
SCB to review and clarify.
114 074214
C
Spec.
SCB to review and clarify.
115
85113 C
Spec.
SCB to review and clarify.
116
C
Spec.
SCB to review and clarify.
117 074214
C
V.E.
LCI to price as alternate
To be reviewed. Show 34" countertop height. Price as 36" and 34"
118
D
A0.39
119 074214
D D
A2.01 A2.01
SCB to review.
120
Is shear wall opening in elevator #1 vestibule required?
R
OK for now.
Does sliding glass door at Entry vestibule 100A needs to be automatic? ID-6.1 door schedule currently does not show the hardware for this opening. Is this opening to get hardware set #10? Please provide hardware information. The diverter trash chute is expensive provide a two yard container for recycling.
121 122 123
D D D
A2.01 A2.01 A2.01
R R R
Does need to be automatic.
Team felt still room for dumpsters. Diverter out. GLP to coordinate with SCB for Package Shelf Owner advised design team to look into Swing Door Options Ceiling of 5th floor to go with plaster. Chris concerned with boxy drop. Soffit needs to be studied. Chris prefers phenolic application
Show package shelf in mailroom.
124
D
A2.01
Is “breakaway” door in vestibule a security risk since they are easily forced open?
R
E-SFT-2 High Density Stratified Timber Panels at 5th floor exterior soffit is scope change from Phenolic Resin Plank on 50% DD Set R SCB Drawing A2.01 shows possible lockers in mail room 100C on South wall while ID 2.01 shows mailbox counter on East wall R Provide a louver for supply air to the garage and eliminate CMU shaft, typical all parking levels. R Remove storage room in NE corner, eliminate slab and provide one additional parking space at top of ramp. R
125
D
A2.01/A7.05
126
D
A2.01/ID2-01
GLP to Coordinate with SCB
D
A2.02
CSA to Review
127
128
D
A2.02
To be accomplished per Daccord.
To be review with PD. Chris wants to remain in. Use as storage. Now called open storage.SCB to Define as storage.
129
D D
A2.02 A2.03
Is bike storage required, will it be used, can it be eliminated?
R R
130 105600
Specification 105600 Storage Assemblies-Bicycle is added scope to the project.
See Item 129
Columns R8 reduce column size and provide one additional space. Transition column size/ shape on the 5 th floor. R Can the windows on the east wall be replaced with a concrete wall? They are all spandrel glass. R
To be accomplished. SCB and CSA to Coordinate and Incorporate Change
131
D
A2.04
132 133
D D
A2.05 A2.05
Discussed as Alternate but only at level 5
Use TPO roof at pool deck level?
R
To be reviewed by SCB
Folding Sliding Glass Wall System, Please let us know where this spec section is applicable. Spec is calls for exterior folding wall system by Nana wall but we found folding partition between Lounge and Conference room on 5th floor which is interior application. R Folding partition is shown at Conference room 502C on A2.05 with note to see ID drawings. We could not locate this info on ID drawings. R
A2.05
Team - Out to be Removed from Drawing Set
134
84333 D
135 136
D D
A2.05 A2.06
Team - Out to be Removed from Drawing Set
At levels below the building to the east make all the east glass insulated spandrel?
R
See Item 132
There are FCU (fan coil unit) with access panel/door shown in walk-in closets, South unit bedroom #2 closet, and study. Please provide interior elevation to show the size of access doors. R
137
D
A2.06
Access doors per unit from Manufacturer.
Access discussed. Integrate with panel. SCB to Detail for CD Documentation
138 139
D D
A2.06 A2.06
Please provide detail elevation and section of gas & electric duplex outlets at balcony areas. R
SE balcony move gas & electrical connection to the spandrel panel.
R
To be relocated to Spandrel
Is trash chute to be on Level 24? A2.11 shows trash chute extended to 24th mechanical penthouse level. R Please provide elevation to determine the louver size which is shown at column line F on A2.11 R
Trash Chute to be Extended Up for Vent. SCB to Clarify in CD Documents
140
D
A2.11
141
D
A2.11
SCB to coordinate.
Be supplied by probel. Team indicated no Rail to be used. Fall protection Provisions only. Limited lighting application. Light Switch to Issue Clarification
142
D
A2.12
Note calls for fall protection: Please define. Railing is required.
R
143
D
A20A & B
Indicates retail & residential canopy, need lighting lay out
R
Detail 1. Glass limitations at terrace door jamb to corner mullion unit. Detail calls out for a 9- 1/2" X 10'-3" panel, glass unit exceeds the 10 to 1 glass size ratio. R Please provide specification and detail of "recessed metal cabinet with gas and duplex outlets" shown on 2/A4.01A R Conflict between documents. Civil drawings indicate pavement for alley, landscape drawings indicate pavers. R
144
D
A4.01A
Team discussed this is Metal and not Glazing
145
D
A4.01A/2
See Item 138
Alley to be repaved. Needs to be CDOT pavers. Civil Drawings to reflect Final Condition
D D
A4.01B A4.01B
146 147
X
VOID
R
DUPLICATE - VOID
Detail 6 typical balcony rail the spider glass handrail connection is very expensive. Provide less expensive typical handrail. R
To be reviewed by team. Chris asked that the Cost/LF be set at less than $225/LF
D D D
A4.01B A4.01B A4.01B
148 149 150
Detail 8 Use TPO roof membrane?
R R
See above
Detail 8A. Where and how often will the metal scupper's occur at the balconies?
SCB to review.
151
D
A4.01B/1
Residential slab thickness is 7 1/2", section and details indicate 8".
R
To Be Discussed in Separate Superstructure Meeting
Typical unit slab edge detail on 4/A4.01B shows aluminum cover above window treatment. Detail 1/ID-8.1 seems showing drywall with reveal piece in the middle. Please clarify what is required at this area. R Current budget for glass handrail is based on Sterling Dula's Element style railing. Detail 6 on A4.01B shows SS spider fittings attached to post. R
152
D
A4.01B/4
SCB to advise which to Follow and Detail
153
57300 D
A4.01B/6
See Item 148