LCI Preconstruction & Estimating Training Manual

If window wall contractor provide galvanized metal closure panel behind insulation, is stud and drywall shown on 2/A4.01c Required? R Detail 3. Section shows an addition horizontal mullion at tub locations. These horizontals are not shown on the elevations. Will these be required? R Detail 1 - Remove the stone on the inside of the multi-story space in the South West corner. This should be painted gypsum board. R

154

D

A4.01C

SCB to review.

155

D

A4.01C

Discussed these are Required. SCB to Detail

Inside corner to be painted SCB to Clarify Detail Team agreed to Paint

156 157 158 159

D D D D

A4.02A A4.02A A4.02A A4.02B

Can we reduce the stone module to 4 feet for a wider stone selection?

R R R

OK Per Team

For all windows in the base use Kawneer 1600 or similar. Detail 4 Delete green roof, do not return stone to inside.

Buy a consistent system for level 5 and below.

To be deleted at corner

Go with flat stone by Team. SCB to detail on this direction

160 161

D D

A4.02B A4.02B

Detail 5D & H – Eliminate the tapered stone and stone accents. The garage is unheated remove all insulation from exterior wall

R R

OK- SCB to be deleted on Documents

At mid span of curtain wall shown on detail 4/A4.02B would require misc. metal support. Please provide detail for the support. R

SCB-CSA - Team indicated Goal is to add mid span support to reduce Curtain wall System. Team to coordinate with Kawneer. Team open to Alternate Simplified Piece for the "Reveal" Intent

162

D

A4.02B

Detail 5C on A4.02B shows decorative metal into aluminum framing. There would be premium for this detail.

163

D

A4.02B

R

Ownership indicated the wood door budget allowance will be set at $30k inclusive of Hardware and Operators.

164 165 166 167

D D D D

A4.03A A4.03B A4.03B A4.03B

A4.03A Solid wood door front entry doors? This will require constant maintenance.

R R R R

Voided item Voided item Voided item

Issue may be run-off. Team for now agrees this item to be eliminated.

168 169

D D

A4.03C A4.03C

Section 4 delete the trench drain

R R

Delete windows above overhead door and make door taller.

Can eliminate

Teams agree to be simplified. Solid Door to be Issued on CD Documents

170

D

A4.03C

Elevation 3 Why is there a glass sectional door? Use a solid door.

R

Glazing above garage door opening shown on 4/A4.03C requires misc. metal support. Please provide detail for the support

171 172 173 174 175 176

D D

A4.03C

R R R R R R

Eliminate condition as directed by Daccord Eliminate condition as directed by Daccord Team Agreed with Plaster Finish in this Area

A4.04 A4.05 A4.05

Detail 1 Revise door it should not go through the floor above.

92400 D

Residential unit balcony ceiling material change from metal panel to plaster

D D D

What is the missing detail numbers on 1/A4.05 Provide detail of maintenance sleeve and cover.

SCB to Detail SCB to detail SCB to review

A4.05/7

A4.06

Delete steel framing for cat walk. Support catwalk on wide concrete beam. How are windows supported? The spans are larger than the window system can span? Lower the concrete beam and shorten the span?

177

D

A4.06

R

SCB to Review

Detail 1. Window system anchors with slotted connections are not tied back to any steel. Where and will steel be provided to tie back to? Please provide support steel details R Precast Curbs at plaza areas. Method of support need to be designed. Current details show the bottom of precast curb stopping at the top of the insulation R

D

A4.06

SCB to detail

178

179 321413

D D D D

A4.07 A4.07 A4.07 A7.05

SCB to review

180 181 182

Detail 5 Eliminate the electronic field vector map leak detection system.

R R R

To Be Eliminated From Drawings

Voided item Voided item

The typical demising partition is a double stud wall. We should explore a less expensive alternative. R Please provide detail at exterior window section detail where drywall wall is present. Behind spandrel glass. R

183

D

A8.01

To be tabled

184

D

A8.01

SCB will detail

Is bridging Required 12” from deck per 092216-6 205.B.1 (This was not included in the budget) Full width of alley will be redone. Coordinate note with Architectural site plan.

185 186

D D

A-General

R R

SCB to Verify

C1.01

Civil Plans to reflect final Pavement Scope

LCI to Define Scope on Bid. (CDOT will have ultimate say based on Street Restoration Agreement)

187

D

C1.01

Team to define scope of street repairs resulting from utility installation.

R

Move storm trap east, eliminate the access manhole/tunnel and place manhole cover directly into storm trap.

188

D

C3.01

R

To be Clarified

To be clarified. CSA Recommended to Verify with Geo Tech Engineer)

189 190 191 192 193

D D D D D

C4.01 C4.01 C4.01 C4.01 C4.01

Can the engineer verify that capping with +/- a foot of CA6 be acceptable. Condition of site after demolition: Site Grading and Excavation:

R R R R R

DAC to Confirm Bid Assumptions DAC to Confirm Bid Assumptions DAC to Confirm Bid Assumptions DAC to Confirm Bid Assumptions

Verify site elevation at 0'-0" or 4'-0" after demolition.

Define type of rubble to be in place to reach final / post demolition elevation

Are perimeter walls to be removed or remain in place.

Can the quantity to be left in place be calculated so that it balances with the basement excavation.

194 195

D D

C4.01

R R

DAC to Confirm Bid Assumptions LCI to Provide Cost Modeling

C-General

Previous budget included HDPE pipe, now we include storm trap.

Under Guideline for Apartment units , note : “place receptacle inside the pantry area since there is no raised area behind the stove at the island or at the peninsulas. “ is this applicable to our project? R

196

D

E0.001

General note that does not apply. To be Removed.

Under Guideline for Apartment units , note : “Vanity light shall be mounted on to the medicine cabinets……. “ is this applicable to our project?

197

D

E0.001

R

General note that does not apply.To Be Removed

Project Notes: Provide Provision of snow melting system for amenities level? Do we need show melting system ? Please confirm R Lighting: lighting E.2 series drawings does not reflect the current light layout & models/ cut sheets as discussed with Light Switch in OAC meeting. R

198

D

E0.001

General note that does not apply.To Be Removed Light Switch to Revise Drawings. Cosentini to Revise E Drawings to Coordinate Drawings To be provided by light switch - Previous $40, 000 allowance.

X

199

D

E2

200 201

D D

E2.03 E2.08

Show back lighting for windows at garage.

R R

Reduce the number of can lights.

Follow light switch Drawings

120V service required at one location per wall of upper cabinets. .DAC to confirm Quantities Need quad or duplex. Noted by Daccord for LCI to Pick up Electrical Scope on Technology Drawings.

202

D

E2.08

Provide power for under cabinet lighting. Switch and light from cabinet supplier.

R

203 204

D D

E2.08 E2.13

Provide power to the LV panel.

R R

Do we need Pole lights / decorative lights for green roof area

No lighting above 5th level. Confirmed.

Can we use one Aluminum cable feeder for CT-1 ,CT-2 & DHP 24 from SWBD1 in lieu of individual copper feed. R

Ok to go with aluminum. Engineer ok with this. CD Set to reflect this option Yes, can be eliminated. Per Cosentini. Based on elevation of occupied space.

205

D

E3.01

206 207

D D

E3.02

If we can eliminate second fire pump we can reduce the size of the generator.

R R

E-General

VOID

Duplicate - VOID

Drawing F2.07 indicates sprinkler system on east side complete, all floors. This conflicts with architectural drawing A7.06. R

208

D

FP2.07

Only at 5 & 6 at North, 6 through 13 on the South.

Window sprinklers for all North residential units on NE side & window sprinklers on 6th floor north side window Only : Chicago does not recognize the use of window sprinklers in the Chicago Code. Chicago may make special allowances in a case by case circumstance, if the engineers/architects propose their case in front of their Standard and Test Committee. R

Meeting on 2/19 with Cosentini and SCB with Standards and Test Committee to verify.

209

D

FP2.07

Requires Mockups per Architect Requirements - 28 Day Notification prior to Mockup Constructions - 7 Day Review Period for Mockups

210 Div. #1 211 A0.21

D D

General General

R R

LCI to present scope of mock-ups Summary

Add additional suppliers for railing.

SCB to add

X

212 213

D D

General General

The garage is now unheated space. Remove insulation and coordinate with all disciplines R General comment :Verify the owners plumbing allowance for residential units is intact . R

SCB to Show new design intent

GLP Reviewing Flow Rate and Fixture Selection.

X

GLP to Confirm Plumbing Fixture Package conforms to Flow Rates Issued

214 215

D D

General General

General comment :Verify the plumbing fixture for this project meets LEED requirements. R

VOID

R

Cosentini to confirm. Riser size is being verified as well as if additional riser is required.

216

D

General

Do we need separate riser for ice makers

R

Return to Table of Contents

11/4/2016

4

9