Building height (residential floors/ occupied spaces) Chicago Building Code 2013 (15-16- 1000) pg 465-466 states.” An interior Standpipe system required in building, the top floor of which is more than 275 ft. above grade, exclusive of space used for sprinkler, elevator, ventilation and other building machinery, shall be separated into two or more zones, each of which shall include a fire pump, pressure maintenance pump, and all other equipment and piping necessary for a complete inside standpipe installation. The lowest system shall serve the portion up to and including the story the floor of which is 275 feet or less above grade. Above 275 feet systems shall be provided to serve zones of not more than 20 stories each”. The latest drawings show the floor height at 271’-11” at the highest occupied floor, Please confirm per code we can to eliminate the second pump. R Define option to go from wood flooring to a less expensive tile that Natalia was talking about and showing us samples relating to this. Also mention on the finishes page. R
Yes, can be eliminated. Per Cosentini. Based on elevation of occupied space. In Laundry Room - Go with porcelain and Base. GLP to revise Drawings to Reflect this.
217
D
General
X
218 219 220 221 222 223 224
D D D D D D D
ID2.02 ID2.05 ID2.05 ID2.05 ID2.05 ID2.05
Is cabinets in Pantry 505 to be a part of Florence scope?
R R R R R R
Team Indicated this would be Florence.
The flooring selections are missing from the tags everywhere except the Theater 508.
Confirmed.
No wall covering spec for Keynote 4
GLP to provide. GLP to provide.
Floor finish and base information is missing for few rooms on 5th floor amenity level
Voided item
Duplicate
ID2.05FM
Is there a shelf under the flat screen in the media room?
GLP to Clarify
One per furniture grouping x 3 GLP to Show on Drawings. Cosentini to pick up in CD Documents
225
D
ID2.05FM
Do we need any in floor electrical outlets for the furniture in the lounge/conference room? R 5 th floor baths / pantry now detailed. Are the pantry cabs by Florense? Is MEP included here? R
226 227 228
D D D
ID3.1 ID3.1 ID3.2
GLP to Confirm and Detail
Voided item Voided item
R R
X
229
D
ID3.2
Show steel supports for stone countertops. Is an apron required to cover the supporting steel R
Mailroom. Yes show apron. GLP to Update
McGrory Glass is shown at Fire Command Panel. Please provide detailed glass and hardware information
230
D
ID3.2/13
R
GLP to Define and Coordinate with SCB
Integrated Medicine Cabinet to be deleted as a standard offering and removed from ID drawings. Possible Upgrade Item. Yes, Enclosure currently goes to the ceiling. Apply tile. Jeremy felt it could offered as an upgrade. Shower door to be held down 6" for standard with No Tile ceiling. GLP to reflect in the revised drawings GLP to Show Design Intent on ID Drawings Access to hot tub motors through closet.GLP to evaluate. Stone slab in four pieces. To be Detailed on GLP drawing set.
X
231
D
ID5.1
Did we ever receive the “integrated medicine cabinet” spec?
R
X
Can we add the master bath shower tile ceiling as a VE and make this part of the upgrade cost if the unit purchaser wants to have a steam generator? R
232 233 234
D D D
ID5.1 ID5.1 ID5.1
Voided item
R R
Define tile patterns on walls and floors.
X
235
D
ID5.1/16
Please provide section of tub deck. Can tub size be reduced.
R
X
236 237 238
D D D
ID5.1/16 ID5.1/19 ID5.1/7
Are we to provide stone slab deck and apron at master bathroom tub or stone tile?
R R R
Voided item Voided item
GLP to coordinate with Florense. Team believes current Florense Laundry Room Scope meets target. GLP to Incorporate into revise ID Drawings.
The team established a $1500 allowance for cabinets in the Laundry room to furnish. Need GLP to show what is being supplied to meet this allowance. R Note that Elevator details 2 and 3 are added. Note the team has established a $25K per cab design to allowance – wrapped panels and back painted glass, etc. What is currently shown will be price to confirm current allowance. R
X
239
D
ID5.2
240 241
D D
ID5.2
Acknowledged
ID5.2/20
Voided item
No
GLP to confirm that Owner’s desired Florense Cabinet package is congruent with their elevations and plan layouts and is coordinated. What is extent of revised Wood Paneling scope at unit entries? Detail 01 seems to be missing wood paneling for about 5’ at left side of elevation?
X
242
D
ID5.3
R
GLP to coordinate with Florense.
X
243 244
D D
ID5.4 ID5.4
R R
GLP to Detail this Area Daccord - Team - OK
Do we think painting the elevator doors is a good durable finish?
They are still showing the Harmon Hinge detail – ‘embrasure’ style door(s). This needs to come out. Can the unit entry doors just be on standard pivot type hinges in the new design. I believe this is what was discussed? R
Owner indicated Harmon Hinge will come out. GLP to Design to Hardware at $500/Pair Budget Allowance and Re-detail and specify alternate Hardware.
X
245 246 247
D D D
ID5.4 ID5.4
Voided item
R R
ID5.4 /09
Need detail at elevator jamb and wood ceiling.
Owner indicated Harmon Hinge will come out. GLP to Design to Hardware at $500/Pair Budget Allowance and Re-detail and specify alternate Hardware.
X
248
D
ID6.1
Confirm embrasure door with Rajack Harmon hinges still remains at typical entry pairs. R
X
249
D
ID6.1
Note that 3/8” is being used for shower doors – need them to pick this up. Says 1-3/4” thick. R Carpet Spec is still the one that would result in a $122K premium. We need to either up the budget or agree on a reduced per SY cost if the $32/SY that was set by others is not achievable. R
GLP to show the 3/8" on the Revised Drawings
250
D
ID6.2
Carpet Spec to Remain as Drawn
GLP to Revise Spec. Wood Flooring Standard is as follows Standard hardwood : 5” wide plank solid oak floor – rift sawn preferably, rift and quartered if not able to get rift only. Leopardo to verify if there is an issue. No plain sliced. ( Note: Carlisle preferred vendor :material cost of unfinished @ $11.92/sf for Old Growth Heirloom Rift & Quartersawn White Oak, 3/4" Thick, Tongue and Groove, Softened Edge, Stress Reliefs, 5" Face Widths, 7' Average Length with Lengths up to 12' ) May purchase stain from Carlisle only.
X
The Wood Floor spec is still Carlisle which was rejected on the CCL. Need to develop the applicable specs R
251
D
ID6.2
252
D
ID6.2
Define the Lobby Drapery Finish and Metal finish listed at the end of their finish schedule? R
GLP - to define
GLP drawings are showing Carlisle wide plank wood flooring within units but specification section 096400 is calling for Kember Creative Floors "Ecoklik" Please advise which product to be priced. Current budget is based on field finished wood flooring with White Oak Rift and Quarter Cut with RST05 Genie Mat (approved CCL#I10C and D1) R
253
96400 D
ID6.2
Specification to Reflect GLP Draiwngs (See Item 251)
DR-1 Window Drapery is listed on Finish Schedule for Lobby. What is the extent of the drapery. Is this to cover Residential Lobby South curtain wall?
254
D
ID6.2
R
GLP to Define
The team needs to get the LEED element addressed which I believe entails changes to faucets and non master-bath showers. Need before pricing. R At the last meeting we believe the intent was to make the Toto toilet standard throughout and get rid of the Dryvit in the Master and also to offer a Lacava only package if this would be more economical perhaps keeping just the Dornbracht Kitchen Faucet. I think Natalia was also looking at fixtures by Gessi ? R
GLP to Provide Information for the proposed Plumbing Fixtures. SCB to Review.
X
255
D
ID6.3
X
Toto Toilet will be the Standard. GLP to Show on revised drawings.
256
D
ID6.3
Residential Toilet Accessories specification is calling for Kohler "Loure Series". GLP drawings are calling for Lacava and Dornbracht.
257
102813 D
ID6.3
R
To be review. LCI to follow GLP drawings.
258
D
ID8.1
Pre-hung Doors profile per detail 31 is an add of $ 85k on CCL Item 36 –
R
LCI to price the pre-hung doors as detailed from GLP Ownership indicated - SCB and GLP to Detail and Advise
The base portion of detail 01– How are they showing it as we had an add for the ¾” x ¾” piece previously? We recommended using a stained base shoe at this condition. R Detail 14 is this correct? This detail will require additional layers of gypsum board at rated partitions. R
X
259
D
ID8.1
X
260 261 262
D D D
ID8.1 ID8.1 ID8.1
GLP - To Be Deleted
Detail 30 where is the knife edge detail used?
R R
GLP to Clarify
X
F Reveal (14/ID 8.1) is still shown on drawings. It was eliminated from the project.
GLP - To be Deleted - From Documents
X
Do we need to provide round wood base at exposed round columns using same profile shown on detail 17/ID-8.1? R
DAC suggested rubber Shoe Stained product. GLP to incorporate this detail at columns.
X
263 264
D D
ID-8.1
ID8.1/24
Voided item
R