Cosentini indicated the intent is for this to set on slab. Need to verify loading and structure for coordination.
299 300
D D
P2.12 S2.01
coordinate and add steel support for 245 gallon hydro tank located on platform above stairs R
To be further reviewed by SCB an CSA
Can the column at N.9 & 1.8 be eliminated?
R
Daccord states to remove. To be removed from documents.
301 302
D D
S2.01 S2.01
Square off the east corners of the core.
R
Why do we have a shear wall opening in front of the south elevator at the ground floor? R Current Design calls for 5" SOG Is this adequate for bridging over rubble. Might a structural slab be required R
To be maintained for 100% DD
CSA recommended Geotech to become involved to advise on this condition. CSA to review this condition and advise if feasible. CSA indicated this will not be possible To be discussed as a separate item-meeting
303 304 305 306 307
D D D D D
S2.01 S2.02 S2.05 S2.06 S2.23
Delete raised slab in NE corner make open to below.
R R R R
Can the shear wall extensions on north side of the core be eliminated? Can the underside of the balcony slabs be flat? No step down? Can the step down in the slab on the north side be reduced?
CSA to review the condition and advise.
The grillage beams for the chillers span 48’ and are very large. Can the column at E7.1 be extended up to cut that span in half and reduce the beam size? R
308
D
S2.24
Yes per CSA. Drawings to indicate column be raised. To be coordinated with mechanical penthouse roof and MEP. Slope of roof to be established by insulation. A lot of piping supported from deck. Per Cosentini .Needs to remain at 12"
309
D
S2.25
Why do we need a 12” slab and beams for the mechanical penthouse roof?
R
Skim Coat Finish specification section, 1.01 Summary states "Skim coat finish on underside of interior concrete slabs. Please advise where this specification section is applicable. R
Team agreed this specification shall be deleted,. To be removed at CD Phase.
310
92300 D
Spec.
Skim Coat Finish specification section, 1.01 Summary states "Skim coat finish on exposed interior columns and wall. Please advise where this specification section is applicable.
Team discussed this will only apply to a few columns. To be clarified in CD phase. Bottom steel could be eliminated above the second level. Coordinate waterproofing membrane above the retail space. Could eliminate bottom load. LCI to price order of magnitude. Owner Decision.
311
D
Spec.
312 032000 313 033000
D D
Spec. Spec.
Can epoxy coating reinforcement be eliminated after the first or second level?
R R
Employ a testing agency to design and verify concrete mixes.
Owner to employ independent testing agency.
Required In General LCI to identify mockups required and send to ownership to review final disposition and requirement. It was assumed "In Place" Mockups are the general intent. Not Required CSA to remove from documents in C Phase.
Exterior Stone Cladding: Paragraph 1.7.C.a identifies the need for fully size mock-up. 6' long x 4' high. Verify R
314 044200
D
Spec.
315 051200
D
Spec.
Structural Steel - Fabricator must be a AISC certified plant - Is this necessary?
R
Specification 122413 Roller Window Shades section 2.04 has "Motor-Operated, Single Roller Shades". Is there any area getting motorized shades? Current budget is based on all shade as manual. R Employee Identification - :Provide ID Tags for Contractor Personnel" "Require Personnel to utilize id tags at all times" - Discuss if owner wishes to have a formal system.. LCI typically uses the safety program orientation and Hardhat Sticker Number to identify employees are for LCI site and have undergone safety orientation. R
Spec. not applicable To be removed from CD Documents.
316
122413 D
Spec.
317 Div. #1
D
Spec.
Daccord indicated LCI to Draft Div 1 Spec for Review
Alternates: Listed Alternate Pricing for Glass and Stone Only Discuss other alternates proposed. Should these alternates include upgrades.
318 Div. #1
D
Spec.
R
Daccord indicated LCI to Draft Div 1 Spec for Review
319 Div. #1
D
Spec.
BIM: Includes BIM to Coordination Drawings. Enclosure / structural not included.
R
Daccord indicated LCI to Draft Div 1 Spec for Review
BIM: Requesting Slab Edge and Embedded Items to be Shown on BIM Model as well as Exterior Enclosure. Need to clarify what is requested in BIM vs. Std Paper for Coordination Drawings R Requesting a Start Up Construction Schedule - Construction Schedule with Cost Loaded and Resource Loaded - Interim Milestone Dates, Etc. Need to Agree on Schedule Work Areas and Milestone Dates R
320 Div. #1
D
Spec.
Daccord indicated LCI to Draft Div 1 Spec for Review
321 Div. #1
D
Spec.
Daccord indicated LCI to Draft Div 1 Spec for Review
322 Div. #1
D
Spec.
Requesting Professional Photographer with 3 Years Experience for Progress Photos.
R
Daccord indicated LCI to Draft Div 1 Spec for Review
323 Div. #1
D
Spec.
Requesting Video Recordings and Existing Conditions Survey
R
Daccord indicated LCI to Draft Div 1 Spec for Review
Quality Control: Requires Contractor QC Plan; Requires Schedule for Tests and Inspections. Testing Agency Required - (Need to determine who has 3rd Party Inspections) The drawings do not reflect an unheated garage. This is true of all disciplines.
324 Div. #1
D D
Spec. Spec.
R R
Daccord indicated LCI to Draft Div 1 Spec for Review SCB to indicated scope intent for this modification. Wood flooring, carpet,etc. Threshold Floor Floating. Ownership requested SCB-GLP coordinate and provide design intent for dis-similar materials Wood flooring, carpet,etc. Threshold Floor Floating. Ownership requested SCB-GLP coordinate and provide design intent for dis-similar materials. Possible Floor Filling Discussed.
325
X
Please provide material and detail information of required thresholds between dissimilar material R
326
D
Spec.
327
D
Spec.
Please provide sections at dissimilar flooring material to determine required slopping
R
Specification for Miscellaneous Rough Carpentry is calling for Certified wood products. Since LEED check list is not calling for FSC wood credit, do we need to use FSC certified wood product? R Specification for Interior Architectural Woodwork is calling for Certified Wood product to be used. Since LEED check list is not calling for FSC wood credit, do we need to use FSC certified wood product R Please advise where the specification 078453 Perimeter Fire Containment System to be applied. R Exterior glazing specification 088000, 2.3 Material, C. Heat-Treated Glass products is calling for "Heat Soak Tested Exterior Glass". This is not currently included in the budget R CCL X7 for 1 1/16" insulated glazing unit-STC38 is currently approved on CCL Revision #5. Exterior material legend on A0.21 still shows 1" insulated glass R Specification section 084128 Fire Rated Entrances and Storefronts is included in 100% DD set. Please advise us where this specification section will be applied. R No floor finish information for level 2 thru 4 at service elevator lobby and stair area. Are we suppose to provide sealed concrete with vinyl base in this area? R Regarding specification 097613 Elastomeric Liquid Flooring, where this specification to be applied. R Specification section 097200 Wall Covering is included on DD set. Is there any wall covering to be provided? R Specification section 102819 Shower Doors and Enclosures is calling for "Cardinal Shower Enclosures-Heavy Glass Enclosures". Are we to follow this spec? R
FSC not on check list. SCB to review and comment if this can be deleted from CD Documents
328
61053 D
Spec.
FSC not on check list. SCB to review and comment if this can be deleted from CD Documents Coordinate with Cosentini. Cosentini to confirm if this spec is applicable to the project.
329
64023 D
Spec.
330
78453 D
Spec.
Comment per current low Window Bidder. SCB to identify if this specification is to be followed.
331
88000 D
Spec.
332
88000 D
Spec.
SCB to confirm
333
84128 D
Spec.
SCB to confirm
334
D
Spec.
SCB to confirm
335
97613 D
Spec.
SCB to confirm
336
97200 D
Spec.
SCB to confirm
337 338
102819 D 85113 D
Spec. Spec.
Do 3/8". To be clarified at 2/19/14 Standards Meeting
Section 1.3, paragraph B, section c, line 1. Define typical wall location.
R
SCB to Clarify on CD Documents
For Audio / Visual design – for each residential unit in base project, includes HNC & cat6 cable for each potential location for speaker & controllers (option/ upgrade). Number of Speaker / locations and zone control need to be finalized with engineering plus. T3.-107 shows complete lay out. R
X
Engineering Plus to Revise Drawings with Final Unit Tech for the standard Package General Note that current drawings indicate owner functionality and will be included in 100% DD Pricing. Currently reduced to 11. Team asked to be reduced further. Engineering Plus to re-issue Tech Drawings with Scope Reductions.
339
D
T- series
340
D
T- series
For Card reader System – Added scope
341
D
T2-101
20 speakers in the lobby are too much? Reduce the number of speakers.
R
Yes - Engineering Plus to reduce as much as possible and final scope will be re-issued on Tech Drawings.
Are speakers required in the 5 th floor lobby and corridor?
342
D
T2-105
R
Daccord asked if good wifi. 3 additional AP's added to exterior. To be coordinated. Enclosure to be defined. Engineering Plus to Coordinate with SCB and Final Access Points to be issued on Revised Tech Drawings. Correct no speakers as part of Residential Unit Standards. To be Deleted from Engineering Plus Residential Drawings and Re-Issued.
X
343
D
T3-102
T3-102 – Are there sufficient wireless access points for the deck?
R
X
344
D
T3-106
T3-106 There should be no speakers in the base scope of work.
R
Return to Table of Contents
11/4/2016
7