BASE BID: Bidder agrees to perform all Work for Bid Category(ies) as described in the Contract Documents, for the Base Bid(s) stated below. For each Bid Category to be bid, include the Base Bid, written and in figures, and the bid category and description.

(Show amounts in both words and figures. In case of discrepancy, amount shown in words will govern).

BID CATEGORY

WRITTEN DESCRIPTION/AMOUNT(S)

BID AMOUNT IN FIGURES

A. MATERIAL

$

B. LABOR

$

C. TOTAL

$

BID BREAKDOWN (SUM MUST MATCH ABOVE TOTAL INCLUDING ALLOWANCES) 2. Schedule of Values:

Total

A. Shop Drawings

$___________

B. Lighting Package (Furnish Only)

$___________

C. Level 1 Work rough-in

$___________

D. Level 1 Kitchen Work

$___________

E. Level 2 rough-in work

$___________

F. Levels 3-9 rough-in work

$___________

G. Level 10 rough In work

$___________

H. Level 11 rough in work

$___________

I.

Level 1 Trim

$___________

J.

Level 1 kitchen trim

$___________

K. Level 2 Trim

$___________

L. Levels 3-9 Trim

$___________

M. Level 10 trim

$___________

N. Level 11 Trim

$___________

O. AV Rough-In

$___________

Electrical - BID FORM