Leopardo Companies Inc.
AJ Gallagher
FA Smoke Detectors
QTY
FA Duct Smoke Detectors
QTY
FA Fire Smoke Curtain Interfaces
QTY
Floor Boxes
QTY
AV Locations
QTY
FSR Boxes with trims
QTY
Projector Locations
QTY
Power connections to Furniture
QTY
INSTALLATION TIMES
1.
A. Shop Drawings
___________ Days
B. Lighting Package
___________ Weeks
C. Level 1 Work rough-in
___________ Days
D. Level 1 Kitchen Work
___________ Days
E. Level 2 rough-in work
___________ Days
F. Levels 3-9 rough-in work
___________ Days
G. Level 10 rough In work
___________ Days
H. Level 11 rough in work
___________ Days
I.
Level 1 Trim
___________ Days
J.
Level 1 kitchen trim
___________ Days
K. Level 2 Trim
___________ Days
L. Levels 3-9 Trim
___________ Days
M. Level 10 trim
___________ Days
N. Level 11 Trim
___________ Days
O. AV Rough in
___________ Days
Electrical - BID FORM
Page 7