LCI Preconstruction & Estimating Training Manual

Leopardo Companies Inc.

AJ Gallagher

FA Smoke Detectors

QTY

FA Duct Smoke Detectors

QTY

FA Fire Smoke Curtain Interfaces

QTY

Floor Boxes

QTY

AV Locations

QTY

FSR Boxes with trims

QTY

Projector Locations

QTY

Power connections to Furniture

QTY

INSTALLATION TIMES

1.

A. Shop Drawings

___________ Days

B. Lighting Package

___________ Weeks

C. Level 1 Work rough-in

___________ Days

D. Level 1 Kitchen Work

___________ Days

E. Level 2 rough-in work

___________ Days

F. Levels 3-9 rough-in work

___________ Days

G. Level 10 rough In work

___________ Days

H. Level 11 rough in work

___________ Days

I.

Level 1 Trim

___________ Days

J.

Level 1 kitchen trim

___________ Days

K. Level 2 Trim

___________ Days

L. Levels 3-9 Trim

___________ Days

M. Level 10 trim

___________ Days

N. Level 11 Trim

___________ Days

O. AV Rough in

___________ Days

Electrical - BID FORM

Page 7

Return to Table of Contents