j) Subcontractor has included restoration of all roads and erosion control to it’s original condition. Site evaluation will be conducted with the subcontractor and Leopardo Superintendent prior to start of work. A site walk thru will also be conducted after work is completed. All deficient items shall be corrected within 48 hours of final walk thru. k) Subcontractor includes dust control associated with their work including but not limited to providing water trucks if necessary. l) Subcontractor includes the cleaning of public roadways including but not limited to street sweeping for their work as required. m) Subcontractor has includes all saw cutting of existing concrete, excavation under existing concrete and removal off site of all spoils and concrete for electrical installations . Concrete replacement will be provided by the concrete subcontractor.
F/A Systems
3. Subcontractor shall provide the following work for all fire alarm systems: a)
Subcontractor has included furnishing and installing a complete F /A system as indicated in the contract documents for the building. This bid should include the fire alarm system for the entire building (both Core/Shell and TI). b) Subcontractor has included all automatic dialers, 911 communication interfacing and etc for a complete system. c) Include 1 year service agreement for monitoring the F/A system. d) Subcontractor shall provide the fan status panel including: All conduit, wiring, Contacts and switches All connections required to activate the fresh air intake and exhaust louvers as required. (Coordinate voltages of dampers with the HVAC and BAS subcontractors.) e) Fire door hold-open/alarm system including relays, all wiring and accessories. Fire doors will be furnished and installed by others. f) Subcontractor shall include all fire alarm connections to all other electrical systems as required for a complete F/A system. g) Subcontractor has included furnishing and installing all duct detectors as required for a complete F /A system. No duct smoke detectors will be provided by the HVAC subcontractor. h) Subcontractor has included to furnish and install all fan shut downs/relays as required for a complete F/A and fan shut down system to within five feet of all HVAC mechanical equipment requiring F/A shut downs. Coordinate with HVAC & BAS installer. i) Subcontractor has included providing multiple times of programming as required for a complete F /A system per the contract schedule. j) Subcontractor shall complete all pre-testing, testing with authorities having jurisdiction, commissioning agent, and etc as required for a complete F/A system. k) Subcontractor has included furnishing a complete panel readout schedule for programmed points prior to programming of the F/A system. This shall be submitted and approved prior to installation of the F/A system. l) Subcontractor has included furnishing and installing all low voltage and power wiring for the fire doors as required for a complete fire door installation. Hanging of control panels, power, and F/A ties have also been included. m) Subcontractor acknowledges that the design drawings are schematic at best and has included all code required devices, wiring, engineering, testing, permit fees and etc for a complete code compliant system. n) Subcontractor shall furnish and install all interface wiring required for interfacing to the smoke curtains. o) Subcontractor shall furnish and install all telephone ties to the fire alarm system as required. Coordinate with Leopardo and the City of Rolling Meadows for ties to system.
Electrical/Fire Alarm Work Scope
Issue Date – 7/16/15
Company____________________________
Signature____________________________
Page 12 of 15