AJ Gallagher - Leopardo
Power Systems
7.
Trade Specific – Power Systems: a)
Subcontractor has included furnishing and installing all power to overhead doors, security cabinets, owner supplied equipment, equipment by other trades, BAS control cabinets, overhead projectors, projector screens, fire doors and elsewhere as shown for a complete power system as specified and indicated in the contract documents. b) Subcontractor has included to furnish and install all power conduit, wiring, j-boxes, hangers, and etc. for a complete power system. c) Furnish and install all power devices as specified and indicated in the contract documents to include but limited to poke- thru’s, floor boxes, electrical outlets, switches, lighting, equipment power, and etc for a complete powered system. Furnish all required inserts for AV and structured cabling subcontractors at boxes provided as part of this scope of work. d) Subcontractor has included to furnish and install all power, low voltage wiring, switching and install all controllers for window shades as required. Window shade controllers will be furnished by others. Shades will be furnished and installed by others. e) Subcontractor has included to furnish and install p-touch labels on all outlets and switch cover plates. f) Subcontractor has included to label all disconnect switches and j-boxes with p-touch labels. g) Furnish and install a complete emergency power system as indicated and shown on the contract documents. h) Provide power to all Security equipment systems as specified and shown on the contract documents. i) Subcontractor shall furnish and install all starters and disconnects as indicated in contract drawings.
Lighting and Lighting Systems
8. Provide the following for a complete lighting system: a)
Provide all lighting fixtures as shown and specified in the contract documents.
b) Provide all lighting control systems and all controls, switches, relays, sensors, cabinets transformers, touch screen controllers etc. for a complete lighting control systems. c) Subcontractor to furnish and install all occupancy sensors, wall box timers, pilot light switches as shown and required. d) Furnish and install a complete emergency lighting system including but not limited to; wire, conduit, signage and etc. for a complete emergency lighting system.
MISCELLANEOUS
9.
Provide the following miscellaneous items: a) Subcontractor has included providing power to all owner furnished items as shown as indicated on the contract documents. b) Subcontractor has included to keep the subcontractor ’ s field staff to date with the most current Architectural, Structural, and MEP design drawings. The field staff shall also have on-site, a copy of their contract, approved submittals, and a set of coordinated (signed off drawings). c) Subcontractor has included all electrical work related to kitchen equipment. Includes but not limited to final connections to food service equipment, conduit wire, empty raceway for ansul system pull stations, disconnects, and as indicated in the contract drawings. d) Subcontractor has included to hook up all furniture provided by others. This subcontractor shall coordinate and assist in helping furniture supplier select the correct internal wiring required for this subcontractors hook up.
Electrical/Fire Alarm Work Scope
Issue Date – 7/16/15
Company____________________________
Signature____________________________
Page 14 of 15