AJ Gallagher - Leopardo
e) If the drawings/specifications call for starters and/or disconnects to be provided by mechanical sub, they are to be included in this bid. If the drawings/specifications do not specify who is to provide these items, the electrical subcontractor will furnish and install
10. Exclusions
a) Low Voltage Conduit for Structured cabling and Security.
Electrical/Fire Alarm Work Scope
Issue Date – 7/16/15
Company____________________________
Signature____________________________
Page 15 of 15
Return to Table of Contents
Made with FlippingBook flipbook maker