Procurement Lead Time Trends Tracker (PLT3)

0 wks

5 wks 10 wks 15 wks 20 wks 25 wks 30 wks 35 wks 40 wks 45 wks 50 wks

DIV01 - Fencing DIV01 - Trailers DIV01 - Misc. Logistics DIV02 - Deep Foundations

DIV02 - Piling (Sheet) DIV02 - Landscaping

DIV03 - CIP Concrete - structural frames DIV04 - Exterior Cladding: brickwork DIV04 - CMU (blockwork) DIV05 - Structural Steel Framing DIV05 - Miscellaneous Metals - architectural iron/metalwork DIV06 - Finish Carpentry: millwork (standard) DIV06 - Finish Carpentry: millwork (specialty/custom) DIV07 - Roofing: asphalt / membrane DIV07 - Roofing: metal DIV07 - Exterior Cladding: natural materials/wood DIV07 - Exterior Cladding: metal panel systems DIV08 - Exterior Cladding: curtainwall DIV08 - Exterior Cladding: curtainwall, *foreign sourced DIV08 - Exterior Cladding: skylights/atrium DIV09 - Drywall/gypsum board partitions/ceilings/soffits DIV09 - Finishes: ceilings (ACT/suspended systems) DIV09 - Finishes: flooring (resilient/carpeting) DIV09 - Finishes: flooring (raised access flooring)

DIV09 - Finishes: interior stone (floor/wall) DIV09 - Finishes: wall covering DIV10 - Demountable partitions DIV13 - Custom furniture DIV14 - Elevators DIV14 - Escalators DIV15a - Sprinklers DIV15c - HVAC package DIV15c - Ductwork and insulation DIV15c - HVAC controls DIV16 - Electrical package (average) DIV16 - Lighting fixtures DIV16 - Transformers DIV16 - Low and High Voltage Switchgear DIV16 - Generators DIV16 - UPS DIV16 - Electrical controls DIV16 - Security Systems DIV16 - IT Infrastructure: equipment DIV16 - IT Infrastructure: data/voice cabling DIV16 - Fire alarm

Shop Dwgs/Submittals

A/E Approval

Material Procurement

Fabrication

Delivery