the controller manufacturer, or their respective representatives, as well as any authorities having jurisdiction, shall be present for the field acceptance test. Fire Pump/Booster Pump Submittals All fire pump and booster pump submittals should, at minimum, include the following items and information: 1. Fire Protection Drawings of the proposed system(s). 2. Manufacturer's specification for the fire pump, driver, controller, etc. 3. Manufacturer's specifications for all materials and peripherals. 4. Manufacturer's certified bench curve for the pump (pump curve). 5. Pump House design and layout information (including location and construction). 6. Single line diagram showing the electric feed arrangement (for Electric pumps). ALARM SYSTEMS Alarm System Submittals Alarm system submittals should, at minimum, include the following 1. Manufacturer's name and model number(s) for the entire system or system component/options. 2. Manufacturer's specification sheets for all equipment/components. 3. Drawings showing system component layout, panel wiring, battery backup (if applicable). SPECIAL PROTECTION SYSTEMS Special Protection System Submittals Alarm system submittals should, at minimum, include the following 1. Drawings of the system 2. Calculations showing required concentrations/densities and durations available from the special protection system. 3. Manufacturer's equipment specifications 4. Occupancy details 5. Satisfactory completion and submittal of the Contractor's Application for Acceptance for the specific special protection system. BOILER AND PRESSURE VESSEL Boiler and Pressure Vessel Plan Submittals Boiler and pressure vessel submittals should, at minimum, include the following: 1. Drawings showing location and layout
13
Return to Table of Contents
Made with FlippingBook flipbook maker