LCI Preconstruction & Estimating Training Manual

11/22/2017

Energy Efficiency Alternate

HVAC

• Hot Water Loop ▫ Unused hot water circulated back to boiler

• Water has lost less heat energy • Easier to heat from 60°F to 82°F • Compared to -7°F to 82°F

Manipulating and Conditioning air to achieve desired comfort

Types of Systems

Roof Top Unit

Air Handling Unit

Pricing Methods

Boiler + Air Cool Chiller/Air Cooling Tower 4 Pipe System

Boiler 2 Pipe System

Constant Volume

Div.

Plumbing Components

Unit

Waste Vent

Ea Ea

Ductwork + Insulation

Ductwork + Insulation

Ductwork + Insulation

Piping PVC Condensate Drain

LF LF

DDC Controls

Pipe to VAV Box

Pipe to VAV Box

15400

Roof Drain and Overflow

LF

Finishand Install Plumbing Fixtures

Ea

Test and Balance

DDC Controls

DDC Controls

Finish and Install Water Softener

Ea

Finish and Install Water Meter

Ea

Test and Balance

Test and Balance

Inside a Standard Packaging Unit

Heating Ventilation and Air Conditioning

24