LCI Preconstruction & Estimating Training Manual

Leopardo Proposed Technical Center Outline Specifications Page 2 of 25 12/13/2012

Fuel analytical measurement systems Gaseous emission analytical system

Control instrumentation and data acquisition systems Transducer interface systems Throttle / rack actuator systems Actuators and shaft guards Engine coolant / oil temperature control Forced engine cooling Instrument box booms and ladder tray supports for emission sample lines Charge air cooling equipment (except chilled water system) Particulate Sampling Unit (PSU) Bag Sampling Unit (BSU)

C. Parking Requirements (100 cars):

a. Provide at least 75 Staff parking spaces b. Provide additional 25 Visitor parking spaces c. Continuous and obscuring screening for parking as may be required by local ordinance d. One (1) enclosed and gated double dumpster location

D. Truck Access Requirements:

a. One (1) Recessed truck well with motorized 9’x10’’ overhead door b. Two (2) Grade level motorized 12’x14’ overhead doors to exterior c. One (1) interior motorized 12’x14’ overhead door to Vehicle Workshop

E. Overhead Crane System

a. See Technical Criteria Matrix for locations and types of 2-ton crane systems

F. Fire Suppression:

a. Fully wet pipe fire suppression (except dynamometers) b. “Clean Agent” chemical fire suppression (dynamometers).

Return to Table of Contents

Made with FlippingBook flipbook maker