RICARDO CHICAGO TECH CENTER (CTC) TECHNICAL CRITERIA MATRIX
ver: 12-5-2012
ARCHITECTURAL
PROCESS
FIRE LIGHTING Protection Lighting
FUNCTIONAL
HVAC HVAC / Exhaust
PLUMBING Plumbing
POWER (Primary Transformer)
IT / AV Voice / Dat
Slab Design
Flooring
Walls
Finish Special
Ceiling
Doors
Power
Special
Process
Crane
Safety / Security
Temp
Humidity
Air Clean
Piped
Bottled Gases
Room Name
OFFICE AREA Lobby
X X X X
X X X X X X X X X X X X
X
X X
X
X
X X X
X
X
X
X
X X X X X X X X X X X X
X
X
X
X X X X X X X X X X X X
Open Plan Area Private Office
X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X X
X
X
X
X X X X X X X X X
X
X
X
X
X
X
X
X
X
Hotel Office / Meeting Room (4 person) Conference Room A (HDTV / Video Conf) Conference Room B (HDTV / Video Conf) Conference Room C Conference Room D (Guest Office / Conf Rm)
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Conference Room E Client Project Center Lunch Room / Vending Toilet / Locker Rooms
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Server Room
X X X
X
X
X
X
X
X
X
X
X
X
X
X X X X
X X X
X
X
X
X
X
Controls & Electronics Lab
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Tile on Wet Walls
TECHNICAL CENTER Mezzanine (Dyno Electrical and Mech Equipment)
Mezzanine: Dyno HVAC / Electrical Equipment
X
X
X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
Mezzanine: Storage
X
X
X
X
X
X
X
X
Engine Dyno #1
Engine Dynamometer Dyno Control Area
X X X X X
X
X
X X X X X X X
X X X X X X X X
X
X
X
X
X
X
X X X X X X
X
X
X
X
X X X X
X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X
X
X
X
X
X
X
X
X X X X
X
X
X
X X X X X X X
X
X
Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno) Engine Dyno #2 Engine Dynamometer Dyno Control Area Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno) Engine Dyno #3
X X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X X X X
X
X
X
X
X
X X X X X
X
X
X X X X X X X
X
X
X X
X X
X X
X
X
X
X
X
X X X X
X X
X X
X
X X X X X X X X X X
X
X
X
X
X X
X
X
X
X X
X
X X
X
X
X X X
X
X
X
X
X
X
X X
X
X
X
X
X X X X
X
X
X
X X X
X
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X X X X
X
X
X
X X X
X
X
X
Engine Dynamometer Dyno Control Area
X X X X X
X
X X X X X X X X
X
X
X
X X
X X
X X
X
X
X
X
X
X X X X
X X
X X
X
X X X X X X X X X X
X
X
X
X
X X
X
X
X
X X
X
X X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X X X X
X
X
X
X X X
X
X
X
Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno)
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X X X X
X
X
X
X X X
X
X
X
Engine Dyno #4 Engine Dynamometer
X X X X X
X
X X X X X X X X
X
X
X
X X
X X
X X
X
X
X
X
X
X X X X
X X
X X
X
X X X X X X X X X X
X
X
X
X
X X
X
X
X
X X
X
X X
X
Dyno Control Area
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X X X X
X
X
X
X X X
X
X
X
Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno)
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X X X X
X
X
X
X X X
X
X
X
Engine Dyno #5 (FUTURE) Engine Dynamometer
X X X X X
X
X X X X X X X X
X
X
X
X X
X X
X X
X X
X
X
X
X X X X
X X
X X
X
X X X X X X X X X X
X
X
X
X
X X
X
X
X
X X
X
X X
X
Dyno Control Area
X
X
X
X
X
X
X
X X
X X
X
X
X
X
X X X X
X
X
X
X X X
X
X
X
Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno)
X
X
X
X X
X
X X
X X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X
X X X X
X
X
X
X X X
X
X
X
Engine Dyno #6 (FUTURE) Engine Dynamometer
X X X X X
X
X X X X X X X X
X
X
X
X X
X X
X X
X X
X
X
X
X X X X
X X
X X
X
X X X X X X X X X X
X
X
X
X
X X
X
X
X
X X
X
X X
X
Dyno Control Area
X
X
X
X
X
X
X
X X
X X
X
X
X
X
X X X X
X
X
X
X X X
X
X
X
Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno)
X
X
X
X X
X
X X
X X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X
X X X X
X
X
X
X X X
X
X
X
Vehicle Workshop Accommodate Class 8 Tractor (2 post 22,000# lift)
X X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X X X
X
X
X
X
X
X
X X
X
X
Access to Dyno Engine Rig
Pre-Rig Station
Rig Station
X
X
X
X X
X X
X
X
X
X
X X
X
X X
X X
X
X
X
X
X
X X X X
X
Crate / Bulk Material Storage Rack
X
X
X
X X
X
X
X X
X
X
X
X
Material Staging
X
X
X
X X
X
X
X X
X
X
X
X
X
Pipe Rack / Fabrication Area
X
X
X
X X
X
X
X X
X
X
X
X
X
X
Hose Bin (wire)
X
X
X
X X
X
X
X X
X
X
X
X
Bolts / Small Parts Bins / Drawers
X
X
X
X X
X
X
X X
X
X
X
X
Fluid Storage
X
X
X
X
X X
X
X
X X
X
X
X
X
Gas bottle storage vented to outside
Dedicated Clean Room HVAC can be relocated
Possible reuse of existing prefabricated walls in Weigh Room
Weigh table requires isolated slab / footing
Technical Support
Particulate Weigh Room Gas Instrumentation Room Gas Bottle Storage Room
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X X X X X
X
X
X
X
X
X
X
Machine Shop
X X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X X X
X
X
X X X X X
X
X
X
X X X X
X
X
Also provide access door to outside
208V; 3Phase AND 208V; 1 Phase
480V; 1 Phase
Welding exhaust to outside
Shipping / Receiving
Shipping Office (proposed) Dock Door Area / Dumpster Warehousing / Bulk Storage
X
X
X
X
X X
X
X
X
X X
X
X
X
X
X
X
X
X X
X
X
X
X
X X
X
X
X X
X
X X X
X
X
X X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
Infrared Unit Heater @ Overhead Door(s)
Spill containment
External Covered Fuel Area 55 gallon drums fuel and oil / 4-330 gallon totes
X
X
X
OTHER EXTERNAL REQUIREMENTS:
1. One 10,000 gallon and three 4,000 gallon double walled underground fuel storage tanks 2. Exterior Mounted 1,900 CFM Industrial Natural Gas Compressor 3. Emergency Generator / Transfer Switch / Switchgear 4. Process Cooling Tower(s) 5. Minimum 6,000 Amp Primary Power Switchboard and 3,000 Amp Motor Control Center (to be verified with 6th Dyno)
Return to Table of Contents
PAGE 1 of 1
RICARDO_Tech Criteria Matrix.xlsx
© 2000 Project Planning Management, Inc 12/10/2012