LCI Preconstruction & Estimating Training Manual

RICARDO CHICAGO TECH CENTER (CTC) TECHNICAL CRITERIA MATRIX

ver: 12-5-2012

ARCHITECTURAL

PROCESS

FIRE LIGHTING Protection Lighting

FUNCTIONAL

HVAC HVAC / Exhaust

PLUMBING Plumbing

POWER (Primary Transformer)

IT / AV Voice / Dat

Slab Design

Flooring

Walls

Finish Special

Ceiling

Doors

Power

Special

Process

Crane

Safety / Security

Temp

Humidity

Air Clean

Piped

Bottled Gases

Room Name

OFFICE AREA Lobby

X X X X

X X X X X X X X X X X X

X

X X

X

X

X X X

X

X

X

X

X X X X X X X X X X X X

X

X

X

X X X X X X X X X X X X

Open Plan Area Private Office

X X X X X X X X X

X

X

X

X

X

X

X

X

X

X

X

X

X X X X X X X X X X

X

X

X

X X X X X X X X X

X

X

X

X

X

X

X

X

X

Hotel Office / Meeting Room (4 person) Conference Room A (HDTV / Video Conf) Conference Room B (HDTV / Video Conf) Conference Room C Conference Room D (Guest Office / Conf Rm)

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X X X X X X X X X X X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

Conference Room E Client Project Center Lunch Room / Vending Toilet / Locker Rooms

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

Server Room

X X X

X

X

X

X

X

X

X

X

X

X

X

X X X X

X X X

X

X

X

X

X

Controls & Electronics Lab

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

Tile on Wet Walls

TECHNICAL CENTER Mezzanine (Dyno Electrical and Mech Equipment)

Mezzanine: Dyno HVAC / Electrical Equipment

X

X

X X X X X

X

X

X

X

X

X

X

X

X

X

X

X

Mezzanine: Storage

X

X

X

X

X

X

X

X

Engine Dyno #1

Engine Dynamometer Dyno Control Area

X X X X X

X

X

X X X X X X X

X X X X X X X X

X

X

X

X

X

X

X X X X X X

X

X

X

X

X X X X

X X X X X X X X X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X X

X

X

X

X

X

X

X

X X X X

X

X

X

X X X X X X X

X

X

Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno) Engine Dyno #2 Engine Dynamometer Dyno Control Area Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno) Engine Dyno #3

X X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X X X X

X

X

X

X

X

X X X X X

X

X

X X X X X X X

X

X

X X

X X

X X

X

X

X

X

X

X X X X

X X

X X

X

X X X X X X X X X X

X

X

X

X

X X

X

X

X

X X

X

X X

X

X

X X X

X

X

X

X

X

X

X X

X

X

X

X

X X X X

X

X

X

X X X

X

X

X

X

X

X

X

X X

X X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X X X X

X

X

X

X X X

X

X

X

Engine Dynamometer Dyno Control Area

X X X X X

X

X X X X X X X X

X

X

X

X X

X X

X X

X

X

X

X

X

X X X X

X X

X X

X

X X X X X X X X X X

X

X

X

X

X X

X

X

X

X X

X

X X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X X X X

X

X

X

X X X

X

X

X

Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno)

X

X

X

X

X

X

X X

X X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X X X X

X

X

X

X X X

X

X

X

Engine Dyno #4 Engine Dynamometer

X X X X X

X

X X X X X X X X

X

X

X

X X

X X

X X

X

X

X

X

X

X X X X

X X

X X

X

X X X X X X X X X X

X

X

X

X

X X

X

X

X

X X

X

X X

X

Dyno Control Area

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X X X X

X

X

X

X X X

X

X

X

Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno)

X

X

X

X

X

X

X X

X X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X X X X

X

X

X

X X X

X

X

X

Engine Dyno #5 (FUTURE) Engine Dynamometer

X X X X X

X

X X X X X X X X

X

X

X

X X

X X

X X

X X

X

X

X

X X X X

X X

X X

X

X X X X X X X X X X

X

X

X

X

X X

X

X

X

X X

X

X X

X

Dyno Control Area

X

X

X

X

X

X

X

X X

X X

X

X

X

X

X X X X

X

X

X

X X X

X

X

X

Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno)

X

X

X

X X

X

X X

X X

X

X

X

X

X

X

X

X

X X

X X

X

X

X

X

X

X

X X X X

X

X

X

X X X

X

X

X

Engine Dyno #6 (FUTURE) Engine Dynamometer

X X X X X

X

X X X X X X X X

X

X

X

X X

X X

X X

X X

X

X

X

X X X X

X X

X X

X

X X X X X X X X X X

X

X

X

X

X X

X

X

X

X X

X

X X

X

Dyno Control Area

X

X

X

X

X

X

X

X X

X X

X

X

X

X

X X X X

X

X

X

X X X

X

X

X

Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno)

X

X

X

X X

X

X X

X X

X

X

X

X

X

X

X

X

X X

X X

X

X

X

X

X

X

X X X X

X

X

X

X X X

X

X

X

Vehicle Workshop Accommodate Class 8 Tractor (2 post 22,000# lift)

X X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X X X

X

X

X

X

X

X

X X

X

X

Access to Dyno Engine Rig

Pre-Rig Station

Rig Station

X

X

X

X X

X X

X

X

X

X

X X

X

X X

X X

X

X

X

X

X

X X X X

X

Crate / Bulk Material Storage Rack

X

X

X

X X

X

X

X X

X

X

X

X

Material Staging

X

X

X

X X

X

X

X X

X

X

X

X

X

Pipe Rack / Fabrication Area

X

X

X

X X

X

X

X X

X

X

X

X

X

X

Hose Bin (wire)

X

X

X

X X

X

X

X X

X

X

X

X

Bolts / Small Parts Bins / Drawers

X

X

X

X X

X

X

X X

X

X

X

X

Fluid Storage

X

X

X

X

X X

X

X

X X

X

X

X

X

Gas bottle storage vented to outside

Dedicated Clean Room HVAC can be relocated

Possible reuse of existing prefabricated walls in Weigh Room

Weigh table requires isolated slab / footing

Technical Support

Particulate Weigh Room Gas Instrumentation Room Gas Bottle Storage Room

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X X X X X

X

X

X

X

X

X

X

Machine Shop

X X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X X X

X

X

X X X X X

X

X

X

X X X X

X

X

Also provide access door to outside

208V; 3Phase AND 208V; 1 Phase

480V; 1 Phase

Welding exhaust to outside

Shipping / Receiving

Shipping Office (proposed) Dock Door Area / Dumpster Warehousing / Bulk Storage

X

X

X

X

X X

X

X

X

X X

X

X

X

X

X

X

X

X X

X

X

X

X

X X

X

X

X X

X

X X X

X

X

X X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

Infrared Unit Heater @ Overhead Door(s)

Spill containment

External Covered Fuel Area 55 gallon drums fuel and oil / 4-330 gallon totes

X

X

X

OTHER EXTERNAL REQUIREMENTS:

1. One 10,000 gallon and three 4,000 gallon double walled underground fuel storage tanks 2. Exterior Mounted 1,900 CFM Industrial Natural Gas Compressor 3. Emergency Generator / Transfer Switch / Switchgear 4. Process Cooling Tower(s) 5. Minimum 6,000 Amp Primary Power Switchboard and 3,000 Amp Motor Control Center (to be verified with 6th Dyno)

Return to Table of Contents

PAGE 1 of 1

RICARDO_Tech Criteria Matrix.xlsx

© 2000 Project Planning Management, Inc 12/10/2012