LCI Preconstruction & Estimating Training Manual

CHICAGO TECHNICAL CENTER

Visitor Entrance

Primary Physical Adjacency

ADJACENCY DIAGRAM: OVERALL

Secondary Physical Adjacency

NOTE: This diagram is not intended to delineate a floor plan but only the adjacency relationships between functions.

Conference Room A 10-12 people HDTV / Video Conf.

Lobby

100 pkg spaces (75 staff / 25 visitor)

“Hoteling” Office (Typical)

Bus Dev

Control

Guest Office / Conf 4-6 people

Design Engineer- ing

Program Manage-

Software Development / IT

Guest Office / Conf 4-6 people

Conference Room B 16-18 people HDTV / Video Conf.

Data Center

ment

(new)

Adv. Systems Eng

PG ITS

Burn-in Room

PG Engines

Could Telecommute

Lunch Rm/ Vending 25 people

Controls

C&E / ASE

Conference Room C 4-6 people

OFFICE AREA

Conference Room E 6-8 people

Powertrain

Equipment Mezzanine above Dynos TECHNICAL AREA

Development

Engine Dyno #1

Shared Shift Workstations

2-Stage Air Compressor

Blast Panel

Test

Control Equip.

Women Shop Shower/ Locker/ Toilet

Men Shop Shower/ Locker/ Toilet

Engine Dyno #2

Machine Shop

High Volume / Pressure Natural Gas Compressor (50 feet from bldg.)

Blast Panel

Test

Control Equip.

Fabrication/ Parts

Engine Dyno #3

Emergency Generator

Prepped Test Engines To Dynamometers

Pre-Rig Station

Blast Panel

Crate / Bulk Storage

Class 1,000 Clean Room

Test

2 @ 4,000 Gallon (double walled)

Control Equip.

Rack

Particulate Weigh Rm.

Above ground Dyno Fuel Tanks

Engine Dyno #4

Underground Dyno Fuel Tanks

Class 8 Tractor / Vehicle

Gas Instru- ment Room

3 @ 4,000 Gallon (double walled) 1 @ 10,000 Gallon (double walled)

Blast Panel

Test

Incoming Test

Engines

Control Equip.

Workshop

Future Large Engine Dyno #5

Gas Bottle Storage

Receiving Dock / Dumpster

Waste Tanks

Blast Panel

Test

(oil/water 400 gallon each)

Control Equip.

Blast Panel

(1) Grade (12x14)

Future Large Engine Dyno #6

Future High Capacity Cooling Tower

High Capacity Cooling Tower(s) Dynos 1-4

Covered Area With Spill Containment (55 gallon drums fuel and oil 4-330 gallon totes)

Shipping/ Receiving (1) Recessed

(supplemental for future large

Blast Panel

Test

Dynos 5-6)

Return to Table of Contents

(1) Grade (12x14)

Control Equip.

Rev: 10-22-2012

© 2012 Project Planning & Management, Inc.