Chicago Technical Center Program
FACILITY SPACE PROJECTIONS Existing 2012
Rev: 11-06-2012
Required 2015
DIVISION
2012 Staff
Current Net SF
Usable SF
2015 Staff
Current Net SF
Usable SF
DEPARTMENT
Circulation
Extended Circulation
Open /
Current
Space
Space
Extended
Space Name
Factor
Factor
Closed Position Title
Employee Name
Location
Positions
Qty
(NSF)
(NSF)
(USF)
Positions
Qty
(NSF)
(NSF)
(USF)
Engine Dynamometer Dyno Control Area
Wall blast panel
1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0
390 100 130 120 390 120 150 310 390 120 150 200 390 120 150 200 390 120 150 200
390 100 130 120 390 120 150 310 390 120 150 200
1.4 1.3 1.3 1.3 1.4 1.3 1.3 1.3 1.4 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3
546 130 169 156
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
450 120 180 310 450 120 180 310 450 120 180 310 900 200 300 450 900 200 300 450
450 120 180 310 450 120 180 310 450 120 180 310 900 200 300 450 900 200 300 450
1.4 1.3 1.3 1.3 1.4 1.3 1.3 1.3 1.4 1.3 1.3 1.3 1.4 1.3 1.3 1.3 1.4 1.3 1.3 1.3
630 156 234 403
Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno)
Engine Dyno #3
1,300
1,423
Engine Dynamometer Dyno Control Area
Wall blast panel
546 156 195 403
630 156 234 403
Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno)
Engine Dyno #4
1,157
1,423
Engine Dynamometer Dyno Control Area
Wall blast panel
546 156 195 260
630 156 234 403
Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno)
Large Engine Dyno #5 (FUTURE)
0 0 0 0 0 0 0 0 0 0
2,495 1,260
Engine Dynamometer Dyno Control Area
14 foot ceiling height, wall blast panel, shared extra cooling tower, 6" gas line
0 0 0 0 0 0 0 0
260 390 585
Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno)
Large Engine Dyno #6 (FUTURE)
2,495 1,260
Engine Dynamometer Dyno Control Area
14 foot ceiling height, wall blast panel, shared extra cooling tower, 6" gas line
260 390 585
Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno)
Mezzanine (Dyno Electrical and Mechanical Equipment)
180
180
Mezzanine: Dyno HVAC / Electrical Equipment
1
4,347 1,029
4347 1029
1.0 1.0
see below see below
1 1
8,966 1,485
8966 1485
1.0 1.0
see below see below
Mezzanine: Storage Mezzanine Stairs
1
1
180
180
1.0
180
1
180
180
1.0
180
Accommodate 2 Class 8 Tractors (28'L x 9'W x 13'H)
Vehicle Workshop
0 0 0 0 0 0 0
3,060
Access Door Staging Access Door Staging
12' x 14' OHD (from Dock) Double leaf door to Pre-Rig
0 0 0 0 0 0 1 1 1 1 1 8 4 1 1 1 1 1 1
0 0 0 0 0 0
0 0 0 0 0 0
1.0 1.0 1.6 1.6 1.6 1.6 1.6 1.3 1.3 1.1 1.6 1.7 1.7 1.6 1.6 1.3 1.3 1.1 1.6
1 1 1 1 2 1 1 1 1 1 1 8 4 1 1 1 1 1 1
400 200 392 392 392 500
400 200 392 392 784 500
1.0 1.0 1.5 1.5 1.0 1.0 1.6 1.3 1.3 1.1 1.6 1.7 1.7 1.6 1.3 1.2 1.3 1.1 1.3
400 200 588 588 784 500
2 Post Lift Vehicle Workstation
22,000# 2-post lift
Vehicle Workstation
Work Area
Tool Storage
Pre-Rig Station
2,203
2,889
Rig Station
15' x 18' framed 4,000 Lb Capacity Crane
270 256 300 576
270 256 300 576
432 333 390 634
504 320 300 784
504 320 300 784
806 416 390 862
Crate / Bulk Material Storage Rack
Material Staging
Pipe Rack / Fabrication Area
60 10
60 80 32 80
96
60 10
60 80 32 80
96
Hose Bin (wire)
Bolts / Small Parts Bins Bolts / Small Parts Drawer
136
136
8
54
8
54
Fluid Storage
80
128
80
128
Technical Support
1,527
2,276
Particulate Weigh Room Gas Instrumentation Room Gas Bottle Storage Room
Class 1,000 Clean Room (Modular / dismountable)
140 240 182 540 100
140 240 182 540 100
224 312 237 594 160 204 102 102
225 450 225 810 200
225 450 225 810 200
293 540 293 891 260 840 240 240 180 180
Blast panel
Machine Shop
Storage
Shop Toilets / Lockers
Shop Toilet / Shower - Men Shop Toilet / Shower - Women
1 1 1 1
64 64
64 64
1.6 1.6 0.0 0.0
1 1 1 1
160 160 120 120
160 160 120 120
1.5 1.5 1.5 1.5
Men's Lockers
0 0
0 0
0 0
Women's Lockers
Shipping / Receiving Dock
776
1,222
Shipping Office
C
Shipping Office 9' x 10' OHD 12' x 14' OHD
0 1 1 4 1 0 0
0
0
0.0 1.0 1.0 1.5 1.0 1.0 1.0
0
1
100 200 400
100 200 400 204 120
1.0 1.0 1.0 1.5 1.0 1.5 1.5
100 200 400 306 120
Recessed Truckwell Door Staging Grade Access Door Staging Bulk Rack (51"x72") Storage
160 160
160 160 204 150
160 160 306 150
1 1 4 1 8 8
51
51
Dumpster
150 150 150
120
Waste Coolant/Water
vented - 400 gallon (8-55 gallon barrels) vented - 400 gallon (8-55 gallon barrels)
0 0
0 0
4 4
32 32
48 48
Waste Oil
Outdoor Covered Area With Spill Containment (55 gallon drums fuel and oil / 4-330 gallon totes)
COMMON BUILDING SUPPORT
3,477 1,260
4,698 1,531
Common Support
O
1 1 1 1 2 1 1 1 1 1 1 1 1
430 150 388
430 150 388
1.0 1.3 1.2 1.7 1.7 1.7 0.0 1.4 1.4 1.6 1.6 1.3 1.3
430 195 465
1 1
350 162
350 162
1.0
350 211 648
Lobby / Reception
C C
1.3
Copy / Fax / Printer / Shredder Ar
Seats >>
30
18 25
540
1.2 1.7
Lunch Room / Vending Copy / Fax / Printer
O
25 25 25
25 50 25
43 85
1 1 2 4 1 1 1 2 1 3
25
43
C C
General Storage
150
150
1.3
195
Storage Room
43 2,217
25
50
1.7
85 3,166
Coat Closets Meeting Space
C C C C C C C
Hotel Office / Meeting Room (4 person)
0
0
0
81
324 300 520 108 336 168 660
1.6 1.3 1.1 1.6 1.3 1.3 1.3
518 390 572 173 437 218 858
Hotel Office / Meeting Room (4 pe Meeting Room (10-12 person) Meeting Room (16-18 person) Meeting Room (4-6 person)
Conference Room A (HDTV / Video Conference) Conference Room B (HDTV / Video Conference)
300 640 108 140 168 220
300 640 108 140 168 220
420 896 173 224 218 286
300 520 108 168 168 220
Conference Room C
Conference Room D (Guest Office / Conf Rm)
Meeting Room (6 person) Meeting Room (6-8 person) Meeting Room (6-8 person)
Conference Room E Client Project Center
External Parking
75 staff / 25 visitor
SUBTOTAL STAFF:
56
78
SUBTOTAL USF (Usable SF): TOTAL Gross Square Feet (GSF):
20,127
34,677
Undersized Building Support>>
93.9% <<Usable/Gross Ratio
90%
<<Usable/Gross Ratio
NOTE: GSF Assumed to include vestibule, exterior wall thickness, common toilet rooms, electrical room, HVAC on roof
TOTAL GSF w/o mezzanine: 21,425
TOTAL GSF w/o mezzanine: 38,530
Mezzanine: 5,376
Mezzanine: 10,631
TOTAL GSF with mezzanine: 26,801
TOTAL GSF with mezzanine: 49,161
Return to Table of Contents
Ricardo_CTC_Program_5.xlsx/PROGRAM; 11/6/2012