LCI Preconstruction & Estimating Training Manual

Chicago Technical Center Program

FACILITY SPACE PROJECTIONS Existing 2012

Rev: 11-06-2012

Required 2015

DIVISION

2012 Staff

Current Net SF

Usable SF

2015 Staff

Current Net SF

Usable SF

DEPARTMENT

Circulation

Extended Circulation

Open /

Current

Space

Space

Extended

Space Name

Factor

Factor

Closed Position Title

Employee Name

Location

Positions

Qty

(NSF)

(NSF)

(USF)

Positions

Qty

(NSF)

(NSF)

(USF)

Engine Dynamometer Dyno Control Area

Wall blast panel

1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0

390 100 130 120 390 120 150 310 390 120 150 200 390 120 150 200 390 120 150 200

390 100 130 120 390 120 150 310 390 120 150 200

1.4 1.3 1.3 1.3 1.4 1.3 1.3 1.3 1.4 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3

546 130 169 156

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

450 120 180 310 450 120 180 310 450 120 180 310 900 200 300 450 900 200 300 450

450 120 180 310 450 120 180 310 450 120 180 310 900 200 300 450 900 200 300 450

1.4 1.3 1.3 1.3 1.4 1.3 1.3 1.3 1.4 1.3 1.3 1.3 1.4 1.3 1.3 1.3 1.4 1.3 1.3 1.3

630 156 234 403

Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno)

Engine Dyno #3

1,300

1,423

Engine Dynamometer Dyno Control Area

Wall blast panel

546 156 195 403

630 156 234 403

Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno)

Engine Dyno #4

1,157

1,423

Engine Dynamometer Dyno Control Area

Wall blast panel

546 156 195 260

630 156 234 403

Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno)

Large Engine Dyno #5 (FUTURE)

0 0 0 0 0 0 0 0 0 0

2,495 1,260

Engine Dynamometer Dyno Control Area

14 foot ceiling height, wall blast panel, shared extra cooling tower, 6" gas line

0 0 0 0 0 0 0 0

260 390 585

Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno)

Large Engine Dyno #6 (FUTURE)

2,495 1,260

Engine Dynamometer Dyno Control Area

14 foot ceiling height, wall blast panel, shared extra cooling tower, 6" gas line

260 390 585

Engine Rig Staging (Dyno entry) Test Equipment (adjacent to Dyno)

Mezzanine (Dyno Electrical and Mechanical Equipment)

180

180

Mezzanine: Dyno HVAC / Electrical Equipment

1

4,347 1,029

4347 1029

1.0 1.0

see below see below

1 1

8,966 1,485

8966 1485

1.0 1.0

see below see below

Mezzanine: Storage Mezzanine Stairs

1

1

180

180

1.0

180

1

180

180

1.0

180

Accommodate 2 Class 8 Tractors (28'L x 9'W x 13'H)

Vehicle Workshop

0 0 0 0 0 0 0

3,060

Access Door Staging Access Door Staging

12' x 14' OHD (from Dock) Double leaf door to Pre-Rig

0 0 0 0 0 0 1 1 1 1 1 8 4 1 1 1 1 1 1

0 0 0 0 0 0

0 0 0 0 0 0

1.0 1.0 1.6 1.6 1.6 1.6 1.6 1.3 1.3 1.1 1.6 1.7 1.7 1.6 1.6 1.3 1.3 1.1 1.6

1 1 1 1 2 1 1 1 1 1 1 8 4 1 1 1 1 1 1

400 200 392 392 392 500

400 200 392 392 784 500

1.0 1.0 1.5 1.5 1.0 1.0 1.6 1.3 1.3 1.1 1.6 1.7 1.7 1.6 1.3 1.2 1.3 1.1 1.3

400 200 588 588 784 500

2 Post Lift Vehicle Workstation

22,000# 2-post lift

Vehicle Workstation

Work Area

Tool Storage

Pre-Rig Station

2,203

2,889

Rig Station

15' x 18' framed 4,000 Lb Capacity Crane

270 256 300 576

270 256 300 576

432 333 390 634

504 320 300 784

504 320 300 784

806 416 390 862

Crate / Bulk Material Storage Rack

Material Staging

Pipe Rack / Fabrication Area

60 10

60 80 32 80

96

60 10

60 80 32 80

96

Hose Bin (wire)

Bolts / Small Parts Bins Bolts / Small Parts Drawer

136

136

8

54

8

54

Fluid Storage

80

128

80

128

Technical Support

1,527

2,276

Particulate Weigh Room Gas Instrumentation Room Gas Bottle Storage Room

Class 1,000 Clean Room (Modular / dismountable)

140 240 182 540 100

140 240 182 540 100

224 312 237 594 160 204 102 102

225 450 225 810 200

225 450 225 810 200

293 540 293 891 260 840 240 240 180 180

Blast panel

Machine Shop

Storage

Shop Toilets / Lockers

Shop Toilet / Shower - Men Shop Toilet / Shower - Women

1 1 1 1

64 64

64 64

1.6 1.6 0.0 0.0

1 1 1 1

160 160 120 120

160 160 120 120

1.5 1.5 1.5 1.5

Men's Lockers

0 0

0 0

0 0

Women's Lockers

Shipping / Receiving Dock

776

1,222

Shipping Office

C

Shipping Office 9' x 10' OHD 12' x 14' OHD

0 1 1 4 1 0 0

0

0

0.0 1.0 1.0 1.5 1.0 1.0 1.0

0

1

100 200 400

100 200 400 204 120

1.0 1.0 1.0 1.5 1.0 1.5 1.5

100 200 400 306 120

Recessed Truckwell Door Staging Grade Access Door Staging Bulk Rack (51"x72") Storage

160 160

160 160 204 150

160 160 306 150

1 1 4 1 8 8

51

51

Dumpster

150 150 150

120

Waste Coolant/Water

vented - 400 gallon (8-55 gallon barrels) vented - 400 gallon (8-55 gallon barrels)

0 0

0 0

4 4

32 32

48 48

Waste Oil

Outdoor Covered Area With Spill Containment (55 gallon drums fuel and oil / 4-330 gallon totes)

COMMON BUILDING SUPPORT

3,477 1,260

4,698 1,531

Common Support

O

1 1 1 1 2 1 1 1 1 1 1 1 1

430 150 388

430 150 388

1.0 1.3 1.2 1.7 1.7 1.7 0.0 1.4 1.4 1.6 1.6 1.3 1.3

430 195 465

1 1

350 162

350 162

1.0

350 211 648

Lobby / Reception

C C

1.3

Copy / Fax / Printer / Shredder Ar

Seats >>

30

18 25

540

1.2 1.7

Lunch Room / Vending Copy / Fax / Printer

O

25 25 25

25 50 25

43 85

1 1 2 4 1 1 1 2 1 3

25

43

C C

General Storage

150

150

1.3

195

Storage Room

43 2,217

25

50

1.7

85 3,166

Coat Closets Meeting Space

C C C C C C C

Hotel Office / Meeting Room (4 person)

0

0

0

81

324 300 520 108 336 168 660

1.6 1.3 1.1 1.6 1.3 1.3 1.3

518 390 572 173 437 218 858

Hotel Office / Meeting Room (4 pe Meeting Room (10-12 person) Meeting Room (16-18 person) Meeting Room (4-6 person)

Conference Room A (HDTV / Video Conference) Conference Room B (HDTV / Video Conference)

300 640 108 140 168 220

300 640 108 140 168 220

420 896 173 224 218 286

300 520 108 168 168 220

Conference Room C

Conference Room D (Guest Office / Conf Rm)

Meeting Room (6 person) Meeting Room (6-8 person) Meeting Room (6-8 person)

Conference Room E Client Project Center

External Parking

75 staff / 25 visitor

SUBTOTAL STAFF:

56

78

SUBTOTAL USF (Usable SF): TOTAL Gross Square Feet (GSF):

20,127

34,677

Undersized Building Support>>

93.9% <<Usable/Gross Ratio

90%

<<Usable/Gross Ratio

NOTE: GSF Assumed to include vestibule, exterior wall thickness, common toilet rooms, electrical room, HVAC on roof

TOTAL GSF w/o mezzanine: 21,425

TOTAL GSF w/o mezzanine: 38,530

Mezzanine: 5,376

Mezzanine: 10,631

TOTAL GSF with mezzanine: 26,801

TOTAL GSF with mezzanine: 49,161

Return to Table of Contents

Ricardo_CTC_Program_5.xlsx/PROGRAM; 11/6/2012

2 of 2

© 2012 Project Planning & Management, Inc.