Leopardo City of Chicago Sidewalk/Street Closure Calculator
LCI # (no dash):
Date:
Project Name: Address: City:
Choose a Name for your closure (ie. "Oak Street Sidewalk")
Comments
City of Chicago Permit Fee
Choose the Type of Activity from the dropdown (see descriptions below)
“Type II activity” shall mean work which involves the construction of a new building. “Type III activity” shall mean any routine maintenance work on a building greater than 80 feet which does not require the removal of any physical structures. This includes, but is not limited to, painting, cleaning and window washing. “Type I activity” shall mean work on a building which involves alteration, repair of exterior facade, work conducted pursuant to the critical examination program, or demolition. This includes, but is not limited to, tuckpointing.
Choose the Type of Obstruction from the dropdown (see descriptions below)
Parking Lane - Street lane containing parking spaces Traffic Lane - Street lane normally used for vehicular traffic, including a bus lane Partial Alley - Alley - if a lane of at least 10 feet is left unobstructed Total Alley - Alley - if a lane of at least 10 feet is not left unobstructed Partial Sidewalk - Sidewalk or parkway - partial closure (applies if using pedestrian canopy to allow pedestrians to pass under the structure) Total Sidewalk - Sidewalk or parkway - total closure Bike Lane - Bicycle lane - total closure
(CBD map)
Is the closure located in the Central Business District?
“Central Business District” means the district consisting of those streets or parts of streets within the area bounded by a line as follows: beginning at the easternmost point of Division Street extended to Lake Michigan; then west on Division Street to LaSalle Street; then south on LaSalle Street to Chicago Avenue; then west on Chicago Avenue to Halsted Street; then south on Halsted Street to Roosevelt Road; then east on Roosevelt Road to its easternmost point extended to Lake Michigan; including parking spaces on both sides of the above-mentioned streets.
What is the Duration of the Closure? Enter either Start and Completion, or Duration
Start Date:
Completion Date:
Duration (Days) :
Days
Duration (Months) :
Months
Length of Closure? Enter length of closure in linear feet
feet
$
-
Budget Permit Fee:
Meter Relocation Fee
Return to Table of Contents
Made with FlippingBook flipbook maker