Leopardo Companies Inc.
Acme Hospital
SECTION 00010 PROJECT MANUAL TABLE OF CONTENTS
[REVIEW OUR CONTRACT WITH THE OWNER AND OTHER PROJECT AND DEPARTMENTAL REQUIREMENTS AND DELETE OR EDIT CONTENTS AND INDIVIDUAL SECTIONS AS APPROPRIATE. SECTION NUMBERS IN ITALICS ARE RESERVED FOR SPECIFIC PROJECT REQUIREMENTS AND A/E INPUT - THESE SECTIONS ARE TYPICALLY WRITTEN BY THE A/E ]
Leopardo Companies Inc.
INTRODUCTORY INFORMATION
ISSUE DATE
January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006
00001 00005 00007 00010 00015 00020 00030
Project Manual Cover ( Cover Sheet ) Certifications Page (Reserved for A/E)
Seals Page (Reserved for A/E)
Table of Contents
List of Drawings (Reserved for A/E) Listing of Schedules (Reserved for A/E)
Information and Identities
Acme Health System Acme, IL
BIDDING REQUIREMENTS*
January 1, 2006 January 1, 2006 January 1, 2006
00100 00200 00210 00220
Advertisement to Bid Instructions to Bidders
Acme Hospital
Description of Work/Special Provisions Work Scopes January 1, 2006 [INSERT BID CATEGORY WORK SCOPE NUMBERS AND HEADINGS AS SUBHEADINGS TO THIS SECTION IF DESIRED]
BID PACKAGE 1 - Foundations & Framework BID PACKAGE 2 - M/E & Interiors
January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006
00230 00240 00300 00330
Schedule and Phasing
Special Schedule Considerations Information Available to Bidders Existing Conditions (Reserved for A/E & Project Team Input ) Environmental Assessment Information (Reserved for A/E) Project Financial Information (Reserved for A/E & Project Team Input )
PROJECT MANUAL
January 1, 2006
00340
January 1, 2006
00350
January 1, 2006
January 1, 2006 January 1, 2006
00400 00430
Bid Proposal Form
Bid Form Supplements (Reserved for A/E & Project Team Input)
*May be included in a Bid Scope Document prepared for each Bid Package, issued under separate cover
CONTRACTING REQUIREMENTS
ISSUE DATE
January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006
00500 00610 00620 00630 00700 00800 00810
Agreement Form (Contract)
Bonds
Insurance
Controlled Insurance Program (CIP) General Conditions of the Contract Supplementary General Conditions On-Site Project Safety and Loss Control Program Substance Abuse Testing Program
January 1, 2006 January 1, 2006
00830 00840
Hazardous Materials
PROJECT MANUAL – REV DATE: 5/27/2010
00010-3
ISSUE DATE: January 1, 2006
SECTION 00010 – Table of Contents
Leopardo Companies Inc.
Leopardo Companies Inc.
Acme Hospital
Acme Hospital
January 1, 2006
00860
Work Force Diversity - (EEO Affirmative Action)
Division 0 Conditions of The Contract and Division 1 General Requirements are found in the Project Manual, a copy of the owner agreement and the AIA General Requirements are available for viewing at the Leopardo Companies Inc. Main Office upon request. A/E/CONSULTANT DRAWINGS [INSERT ARCHITECT’S TITLE AND DATE OF DOCUMENTS INCLUDING AND A LISTING OF DRAWING NUMBERS AND DATES]
January 1, 2006
00861
Minority Business Utilization (MBE/WBE/DBE)
January 1, 2006 January 1, 2006 January 1, 2006
00870 00880 00890
Labor Relations
Regulatory Requirements
Permits
DIVISION 1 GENERAL REQUIREMENTS
In example:
January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006 January 1, 2006
01140 01170 01180 01210 01230 01250 01270 01290 01310 01320 01330 01350 01352 01360 01365 01370 01400 01420 01450 01500 01510 01520 01530 01540 01550 01580 01630 01700 01720 01730 01740 01750
Use of Premises
Architectural Drawings A301, A401, A503 and A601 Dated xxxxx Civil Drawings C100, C200, C300 and C400 Dated xxxxx MEP Drawings E100, M200, P300, and FP400 Dated xxxx
Infection Control Procedures
Project Utility Sources (Reserved for A/E )
Allowances (Reserved for A/E) Alternates (Reserved for A/E)
Changes in the Work
OTHER DOCUMENTS ISSUED FOR BID PACKAGE NUMBER
Unit Prices (Reserved for A/E & Project Team Input )
In example: Leopardo Companies Inc. Project Manual Volume One (1 or 2) dated August 17, 2007 . Phase 1 Environmental Site Assessment Proposed Police Station Northeast of the Intersection of Indian Trail Road and Trask Street, Aurora, Kane County, Illinois Project No. 11067843 October 6, 2006
Payment Procedures
Meetings
Communications
Submittals
Special Procedures (Reserved for A/E & Project Team Input )
[INSERT ANY OTHER SEPARATELY BOUND DOCUMENTS USED AND DISTRIBUTED FOR BIDDING PURPOSES--I.E., SOIL REPORTS, SURVEYS, ETC.]
LEED Requirement Coordination (General)
3D Coordination Requirements
Coordination Drawings Quality Requirements
References and Standards (Reserved for A/E)
Testing and Inspection Services
Interim Life Safety Plan
Fire Precautions and Protection
Temporary Construction Facilities & Controls
Field Engineering and Layout
Cutting and Patching
Clean-up and Final Cleaning
Project Signage ID (Reserved for A/E & Project Team Input)
Product Substitutions Contract Close-out
Project Record Documents
Operations and Maintenance Data
Warrantees and Guarantees
Systems Demonstration, Training and Start-up
DIVISIONS 2 THROUGH 17 TECHNICAL SPECIFICATIONS (To be issued by A/E)
List all specification section numbers, a description for each section number and the date for each section. Insert this information here.
In example:
Issue Date
• • •
03300 03490 05120
Cast-In-Place Concrete
July 31, 2007 July 31, 2007 July 31, 2007
Glass –Fiber Reinforced Concrete
Structural Steel
Return to Table of Contents
PROJECT MANUAL – REV DATE: 5/27/2010
00010-4
ISSUE DATE: January 1, 2006
PROJECT MANUAL – REV DATE: 5/27/2010
00010-5
ISSUE DATE: January 1, 2006
SECTION 00010 – Table of Contents
SECTION 00010 – Table of Contents
Made with FlippingBook flipbook maker