Leopardo Companies Inc.. Any corrective work necessary to satisfy requirements of the Contract Documents shall be performed promptly by the previous Subcontractor to prevent delay to the work under the subsequent Contracts. After corrective work is accomplished the subsequent Subcontractor shall furnish written acceptance of the work as noted above. Leopardo Companies Inc.’s participation in a joint review under this paragraph shall in no event be deemed to constitute approval of any layout or other Work that fails to comply with the Contract Documents. G. Each Subcontractor shall be responsible to take such field measurements as may be required to determine the size of ordered material. In the event "guaranteed dimensions" are required, the Subcontractor shall promptly advise other Subcontractors through Leopardo Companies Inc. by use of drawings, templates or mock-ups of the required conditions. H. All Work, and in particular, piping, ducts, conduit and similar items, shall be neatly and carefully laid out to provide the most useful space utilization and the most orderly appearance. Except as otherwise indicated or directed, piping and similar Work shall be installed [VERIFY WITH OWNER AND A/E-as close to above ceiling floor slabs and walls] as conditions reasonably permit, located to prevent interference with other Work or with the use of the spaces. . Before Subcontractor installs a valve in an exposed location, it must make all efforts to install it in an accessible, concealed location. Subcontractors shall carefully plan the layout and review any questionable installations with Leopardo Companies Inc.. I. The Owner or Leopardo Companies Inc. may utilize a registered land surveyor to verify alignment and layout of certain portions of the Work. If that Work is out of tolerance or incorrect, the installing Subcontractor will be responsible for prompt correction of the Work to comply with the Contract Documents, along with all expenses incurred by Owner or Leopardo Companies Inc. in such verification process, including, but not limited to, the cost for the surveying services, as well as the additional time expended by Leopardo Companies Inc. personnel at standard billing rates.
SECTION 01530 FIELD ENGINEERING AND LAYOUT
PART 1 - GENERAL
1.01
RELATED DOCUMENTS
A. Attention is directed to Bidding and Contract Requirements, and to Division 1, General Requirements, which are hereby made a part of this Section.
1.02
LAYOUT OF THE WORK
A. Each Subcontractor shall employ a qualified engineer or registered surveyor to stake out and locate the construction and reference points as needed to properly locate the Work under its contract.
OR
A. Each Subcontractor shall be responsible for the layout and engineering of its own Work from the established points and lines given by a registered surveyor employed by Leopardo Companies Inc. and to coordinate with all other trades. B. Each Subcontractor is responsible for detailed and accurate layout of its own and its Subordinate Parties’ ’ Work to dimension from the principal lines, grades and levels set forth in the Contract Documents or the principal lines, grades and levels provided by a registered surveyor hired by [ASSIGN TO A SPACIFIC SUBCONTRACTOR OR INDICATE BY Leopardo Companies Inc..] Each Subcontractor shall make provisions to preserve all control points, such as monuments, stakes, bench marks or other datum points and shall replace at its own cost any of these which might be lost or displaced through its neglect. C. Subcontractors shall examine the conditions under which the Work is to be installed, shall take field measurements and verify field conditions and shall carefully compare such field measurements and conditions and other information known to the Subcontractor with the Contract Documents before commencing activities. Any errors, inconsistencies, omissions, discrepancies or conditions detrimental to proper performance of the Work that are discovered shall be reported to Leopardo Companies Inc. at once. Subcontractors are not to proceed until the required corrections are accomplished. D. The exactness of grades, elevations, dimensions, or locations given on any Drawings issued by Architect or the work installed by other contractors, is not guaranteed by Owner or Leopardo Companies Inc.. The Subcontractor shall, therefore, satisfy itself as to the accuracy of all grades, elevations, dimensions, and locations. In all cases of interconnection of its Work with existing or other Work, it shall verify at the site all dimensions relating to such existing or other Work. Any errors due to the Subcontractor’s failure to verify all such grades, elevations, dimensions, or locations shall be promptly rectified by the Subcontractor without any additional cost to the Owner or Leopardo Companies Inc... E. As the Work progresses, the Subcontractor shall prepare lay out drawings showing the exact locations of Work under its Contract as a guide to all trades. Prior to any installation, the separate Subcontractors shall exchange layout drawings and coordinate the Work and be subject to verification by all subsequent Subcontractors. F. As Work under each Agreement commences, the condition of preceding Work under other agreements shall be verified and accepted by each subsequent Subcontractor when appropriate. Verification may, at Leopardo Companies Inc.'s discretion, include a joint review by the subsequent Subcontractor, previous contractor(s), and Leopardo Companies Inc. to note any corrective Work required, damage to previous Work, verification of elevations, tolerances, levels and plumbness, critical dimensions, surface conditions, and similar items affecting the Work under the Contract Documents and particularly items which prevent acceptance by the subsequent contractors. The verification review procedures and findings shall be documented in writing by subsequent Contractors, signed by all parties, and copies provided to the
END OF SECTION 01530
PROJECT MANUAL – REV DATE: 1/04 SECTION 01530 – Field Engineering and Layout
01530-1
ISSUE DATE: January 1, 2006
PROJECT MANUAL – REV DATE: 1/04 SECTION 01530 – Field Engineering and Layout
01530-2
ISSUE DATE: January 1, 2006
Leopardo Companies Inc.
Acme Hospital
Leopardo Companies Inc.
Acme Hospital
specific finish and material involved in making the patches. All patching is to be done in a neat and workmanlike manner to the satisfaction of Leopardo Companies Inc.. Defective Work shall be corrected at no cost to the Owner and Leopardo Companies Inc.. E. Where new Work connects with existing Work, Subcontractor shall do all necessary cutting and fitting required to make a satisfactory connection with the Work to be performed so as to leave the entire Work in finished and workmanlike condition. Furnish all labor and materials to this end, whether or not shown or specified. All measurements must be verified at the site.
SECTION 01540 CUTTING AND PATCHING
PART 1 - GENERAL
1.01
RELATED DOCUMENTS
A. Attention is directed to Bidding and Contract Requirements, and to Division 1, General Requirements, which are hereby made a part of this Section.
F. Employ the original installer and fabricator, when possible, to perform cutting and patching for:
1.02
INSPECTION
1. Weather-exposed or moisture-resistant elements.
A. Before cutting existing surfaces, examine surfaces to be cut, including elements subject to damage or movement during cutting and patching work. Report any unsatisfactory or questionable conditions to Leopardo Companies Inc. in writing. B. Before proceeding, meet at the site with Leopardo Companies Inc. and the parties involved in cutting and patching, including mechanical and electrical trades. Review areas of potential interference, conflict and possible effects on the Owner’s existing operations. Coordinate procedures, temporary support, methods of dust and water protection, etc. and resolve potential conflicts before proceeding. C. When working in and around existing buildings, if any hazardous material is encountered or is suspected to be present, Leopardo Companies Inc. must be notified and Work in the affected area is to stop as described in Section 00840 Hazardous Materials until further direction is given by Leopardo Companies Inc. or the Owner.
2.
Sight-exposed finished surfaces.
G. Execute fitting and adjustment or products to provide a finished installation to comply with the specified products, functions, tolerances and finishes.
H. Subcontractor shall restore Work which has been cut or removed and shall install new products to provide completed Work in accordance with the Contract Documents. Each Subcontractor will be responsible to pay the appropriate subcontractor as designated by Leopardo Companies Inc. for restoring any portion of the Project that is disturbed, including but not limited to, slabs, walls, ceilings, fire rated partitions, spray-on fireproofing, and finishes, to their original state as a result of Subcontractor's action.
I. Refinish entire surfaces as the Subcontractor’s Work scope requires to provide an even finish to match adjacent surfaces and finishes.
1.03
PREPARATION
1. For continuous surfaces, refinish to nearest intersection.
A. Provide adequate temporary support as necessary to assure the structural value and integrity of the affected portion of the work. Where specified or required, submit temporary support methodologies to the Architect for approval. B. Provide devices and methods to protect adjacent areas or other portions of the Project from damage including dust protection, water protection, exposure, maintain excavations free of water, and all other devices and methods as necessary to provide protection from the elements.
2.
For an assembly, refinish the entire unit.
J. Removal and replacement of ceilings not scheduled to be replaced shall be the responsibility of the Subcontractor requiring access.
K. Subcontractor shall be held responsible for reckless cutting of holes in slabs, walls or other finishes, or for scraping off areas of fireproofing larger or greater than that which is necessary for installation of its Work.
1.04
EXECUTION
END OF SECTION 01540
A. The use of [INSERT gasoline powered equipment, jackhammers or power actuated tools, explosives, OR AS APPROPRIATE] is prohibited on this Project. [INSERT IF REQUIRED - The use of electric and pneumatic impact hammers must be first authorized and coordinated by the Leopardo Companies Inc. prior to usage.] B. Each Subcontractor on behalf of itself and its Subordinate Parties is responsible for the cutting of all holes and openings through existing walls, partitions, ceilings, floors and roofs as necessary for the installation of its Work as specified in the Contract Documents. Holes and openings shall be neatly cut and of minimum size to allow the Work to be installed. Execute cutting and demolition by methods which will prevent damage to other Work, and will provide proper surfaces to receive installation of repairs. C. Execute work in such a manner as to minimize disruptions to or interference with the Owner’s normal operations or functioning in the existing buildings and provide all means necessary to provide safety and convenience of those employed in and about the premises. D. Each Subcontractor is responsible for patching of all holes and openings it makes. Fit work should be airtight to pipes, sleeves, ducts, conduit and other penetrations through surfaces. Patching is to match adjacent surfaces in materials and finish. Each Subcontractor is to utilize only tradesmen skilled in the
Return to Table of Contents
PROJECT MANUAL – REV DATE: 1/04 SECTION 01540 – Cutting and Patching
01540-1
ISSUE DATE: January 1, 2006
PROJECT MANUAL – REV DATE: 1/04 SECTION 01540 – Cutting and Patching
01540-2
ISSUE DATE: January 1, 2006
Made with FlippingBook flipbook maker